Loading...
HomeMy WebLinkAboutWPO200800064 Review Comments Erosion Control Plan 2008-10-17� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2008 - 00064, Hyland Ridge off site sewer improvements,ESC Plans Plan preparer: WW Associates Owner or rep.: Southern Development — Keith Lancaster Plan received date: June 9, 2008 (Rev. 1) 04 September 2008 Date of comments: July 22, 2008 (Rev. 1) 17 October 2008 Reviewer: Andrew Lowe (Rev. 1) Phil Custer The erosion and sediment control plan for Hyland Ridge off site sewer improvements, submitted on September 4, 2008, has been reviewed. The plans cannot be approved as submitted and will require the following changes /corrections prior to final approval. A. Erosion Control Plan (WPO- 2008 - 00064) 1. ESC approval cannot be granted until we receive copies of signed and recorded deeds of easements for each property associated with the project. [DM] (Rev. 1) Comment has not been addressed. Also, engineering review recommends, but will not require, obtaining larger construction easements than those shown on the plan. 2. Show location of the Construction Entrance on the plan. (Rev. I) Comment has been addressed. 3. Provide Utility Stream Crossing per Std. and Spec. 3.25 VESCH. (Rev. 1) Please specify the size of the pipe on the plan. 4. I am unclear if the DD and LS shown on sheet 10 will be permanent? a. If the DD is temporary please change the LS to OP outlet protection. [3.18] (Rev. 1) Comment has been addressed. b. Please provide permanent conveyance for the concentrated flow coming through the site at the fill location. [MS -8] (Rev. 1) Please provide a cross - section of this channel. c. Show permanent grading necessary at the sediment trap and fill slope to continue the existing channel above the fill slope to the existing channel below the fill slope. (Rev. 1) The sediment traps require a few corrections. L Wet storage on traps cannot be deeper than Oft. II. The crest of the trap must be Ift below the top of the embankment. III. The calculation template for sediment trap 2 appears to have several errors. IV. The plan shows sediment trap 2 having a width of Oft. Please correct. V. The embankment for sediment trap I does not appear to be graded correctly. VI. The weir of sediment trap I is shown as a baffle. 5. Show low- maintenance ground cover for the 2:1 slopes. (Rev. 1) Please correct the table on sheet C -8 so that it reads "Low Maintenance Slopes, Steeper than 3:1." Slopes steeper than 2:1 will not be permitted. Engineering Review Comments Page 2 of 2 6. Provide additional controls below the fill at the existing pond. (Rev. 1) Comment has been addressed. 7. An Erosion and Sediment Control bond will be computed by the County once the plans are approved. (Rev. 1) Comment remains unchanged. 8. As a note this project will need a VSMP permit from DCR, Matthew Grant at 804 - 225 -3068 can assist with questions. (Rev. 1) This comment was for informational purposes. 9. Additional review comments may come on the next plan submittal due to the required changes. a. (Rev. 1) Please show critical slopes on the plan. Critical slope disturbance will be considered exempt according to Section 18- 4.2.6.c. b. (Rev. 1) The grading on the Cascadia property will require determination from the Planning Department that the grading is consistent with the approved rezoning plan. The plan is currently under their review. c. (Rev. 1) Please show a staging and parking area on the plan. d. (Rev. 1)Approval from the Army Corps of Engineers will be needed for the work in state waters. Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact me at 434 - 296 -5832 ext. 3072 or pcuster @albemarle.org to schedule an appointment. File: E2_esc_PBC_WPO- 2008 -00064 - Hyland Ridge off site sewer improvements.doc