HomeMy WebLinkAboutSDP200800066 Review Comments Reinstate plan deferred by applicant 2008-09-29*—&A
County of Albemarle
Department of Community Development
Memorandum
From: Max Greene, Current Development engineering review
Date: 29 September 2008
Subject: Hunters Way major site plan amendment.
The major site plan amendment has been reviewed.
1. Two -way travelways will be a minimum of 20' in width. [18- 4.12.17.c.1] Please expand the
existing 16' travelway to at least 20' in width.
2. SWM planting plan required. Please confirm that the proposed plants for the BMP are 1 -HVI,
3. 3 -VBDN, and I -NSY. If correct, please show this list of plants on the BMP plan for bonding and
inspection purposes.
4. VDOT entrance and site distance approval is required.
5. Health Department approval for septic system is required.
6. Please explain the "Tank farms" shown on the plan. Tank Farms are listed as "An oil
depot (sometimes called a "Tank Farm ", an "Installation" or a "Terminal ") is an industrial
facility for the storage of oil and/or petrochemical products and from which these
products are usually transported to end users or further storage facilities.
file: El_psp_MRG_Hunters Way Major Amendment.doc