Loading...
HomeMy WebLinkAboutWPO200800040 Review Comments Stormwater Management Plan 2008-09-29*—&A County of Albemarle Department of Community Development Memorandum From: Max Greene, Current Development engineering review Date: 29 September 2008 Subject: Hunters Way major site plan amendment. The major site plan amendment has been reviewed. 1. Two -way travelways will be a minimum of 20' in width. [18- 4.12.17.c.1] Please expand the existing 16' travelway to at least 20' in width. 2. SWM planting plan required. Please confirm that the proposed plants for the BMP are 1 -HVI, 3. 3 -VBDN, and I -NSY. If correct, please show this list of plants on the BMP plan for bonding and inspection purposes. 4. VDOT entrance and site distance approval is required. 5. Health Department approval for septic system is required. 6. Please explain the "Tank farms" shown on the plan. Tank Farms are listed as "An oil depot (sometimes called a "Tank Farm ", an "Installation" or a "Terminal ") is an industrial facility for the storage of oil and/or petrochemical products and from which these products are usually transported to end users or further storage facilities. file: El_psp_MRG_Hunters Way Major Amendment.doc