Loading...
HomeMy WebLinkAboutSDP200800136 Review Comments Preliminary Site Plan 2008-09-30*-&A County of Albemarle Department of Community Development Memorandum To: Elizabeth Marotta, Current Development Project Planner From: Phil Custer, Current Development engineering review Date: 30 September 2008 Subject: Airport Road Office Plaza (SDP- 2008 - 00136) The preliminary site plan for Airport Road Office Plaza has been reviewed. The engineering review for current development cannot recommend approval to the plan at this time. The following comments are provided. 1. Please provide a benchmark on the plan. 2. The retaining wall along the western property line should be moved farther from the undisturbed buffer. It is unlikely that construction of the wall in the location shown will not disturb the buffer. Between the wall and the buffer, the applicant should also provide for drainage from offsite so water does not flow into wall and create long term erosion issues. The applicant should also provide for a 20ft screening area between the wall and the sanitary sewer easement. [18-32.7.91 The conceptual stormwater management plan is insufficient. a) The applicant has not provided an analysis of the proposed stormwater management facilities compared to the required removal rate of the site. The next submittal should include a modified simple removal rate spreadsheet and a map of the drainage areas to each facility. Each facility must meet or exceed the required removal rate. b) A water quality swale will likely not meet the required removal rate for the site (see above). Additionally, as designed, it appears the facility would not be able to hold the required WQv. c) A large portion of the site does not appear to pass through a water quality treatment facility. In the applicants' critical slope waiver request and on the cover sheet, filterras were mentioned as a method of treatment but none were shown on the plan. Please show the location of proposed filterras and modify grading so that all parking lot runoff has the opportunity to pass through these facilities. Facilities must capture as much runoff from the site as possible. 4. A critical slope waiver from the Planning Commission must be approved. The applicant has submitted a request. The engineering review of the critical slope disturbance will be given in a separate letter. 5. Please show the existing entrance across Timberwood Blvd. The centerline of the office plaza entrance should be aligned with the existing entrance of the Baptist Church. [18- 32.7.2] 6. Please provide safe and convenient pedestrian access from the spaces in the southern lot to the building. [18- 32.7.2] 7. Are there existing sidewalks along Timberwood Blvd. and Airport Road? If so, please label Current Development Engineering Review Comments Page 2 of 2 them on the plan. If not, please provide new sidewalks along the VDOT ROW. The following comments are final site plan comments provided to the applicant as a courtesy. 1. An analysis of the downstream channel will be required before approval of the WPO plan can be given. Depending on the condition of the downstream channel, additional detention may be required per state law. 2. The maximum slope allowed in parking lots is 5 %. 3. Retaining walls adjacent to parking and travelways will require a VDOT guardrail. 4. The plantings in the biofilters do not appear to meet the requirements listed in the design manual. Pile: G1_1)sp_PBC_,,dp?OO800136.doc