Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800076 Review Comments Bond Estimate 2008-09-22
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Cove Lawn PROJECT NUMBER: WPO200800076 DATE OF ESTIMATE: 09/22/08 ESTIMATE BY: ADP BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL "SEED, FERTILIZE, MULCH" ACRE 0.27 1500 405 SILT FENCE LF 275 5 1375 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT TRAP 2 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 MITIGATION - SEEDLINGS W /OUT TUBES EA 457 7 3199 SUBTOTAL 6979.00 CONTINGENCY & ADMINISTRATION LS 25% 1744.75 TOTAL 8723.75 BOND AMOUNT REQUIRED 8800.00