Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200700042 Review Comments Bond Estimate 2008-09-29
PROJECT NAME: Ballinger Farm FILE #: WPO- 2007 -00042 DATE APPROVED: 25- Sep -08 BMP Type Item Unit Amount Unit Cost Subtotal site clearing acre 0 $7,100.00 $0.00 dam const.on site material cubic yard 600 $4.00 $2,400.00 class 1 rip -rap square yard 0 $55.00 $0 class 2 rip -rap square yard 0 $110.00 $0 CMP Riser Structure each 1 $400.00 $400 Stream Buffer Sign Installed each 20 $50.00 $1,000 EC -2 EC -3 ditch stabilization linear foot 0.00 $10.00 $0 maintenance road linear foot 185.00 $8.00 $1,480 CMP pipe linear foot 60.00 $25.00 $1,500 EC -3, EC -2 matting square yard 0.00 $10.00 $0 Biofilter 1 $1,975 Biofilter 2 $3,025 Biofilter 3 $1,582 Biofilter 4 $1,582 Biofilter 5 $3,942 Sediment Basin Biofilter $4,620 SUBTOTAL 23,505 25% Contingency $5,876 TOTAL $29,381 ROUNDED TOTAL $29,000 MINIMUM TOTAL AFTER REDUCTION $5,800