HomeMy WebLinkAboutSDP200800146 Review Comments Preliminary Site Plan 2008-10-22*-&A County of Albemarle Department of Community Development The preliminary site plan amendment for Hollymead Towncenter Area C -9 has been reviewed. The engineering review for current development cannot recommend approval at this time. The following items must be addressed before approval can be recommended: 1. Temporary easements will be necessary in order to construct this project. Please provide letters of consent from adjacent property owners giving permission for temporary construction on their parcels. 2. The parking lot should have no grades greater than 5 %. 3. A loading space appears to be needed in the new parking area. The following final site plan comments have been provided as a courtesy to the applicant and will not need to be addressed to receive preliminary approval. 1. An analysis of the downstream stormwater conveyance system will be required during the final site plan per MS -19. 2. In order for the SWM plan to be approved, an analysis of the existing pond will be required to confirm that the pond will meet the quality and quantity requirements for the project. File: El_pmj_PBC_sdp200800l46.doc Memorandum To: Gerald Gatobu, Current Development Project Planner From: Phil Custer, Current Development engineering review Date: 22 October 2008 Subject: Hollymead Towncenter Area C -9 (SDP- 2008 - 00146) The preliminary site plan amendment for Hollymead Towncenter Area C -9 has been reviewed. The engineering review for current development cannot recommend approval at this time. The following items must be addressed before approval can be recommended: 1. Temporary easements will be necessary in order to construct this project. Please provide letters of consent from adjacent property owners giving permission for temporary construction on their parcels. 2. The parking lot should have no grades greater than 5 %. 3. A loading space appears to be needed in the new parking area. The following final site plan comments have been provided as a courtesy to the applicant and will not need to be addressed to receive preliminary approval. 1. An analysis of the downstream stormwater conveyance system will be required during the final site plan per MS -19. 2. In order for the SWM plan to be approved, an analysis of the existing pond will be required to confirm that the pond will meet the quality and quantity requirements for the project. File: El_pmj_PBC_sdp200800l46.doc