Loading...
HomeMy WebLinkAboutWPO200800095 Review Comments Erosion Control Plan 2008-10-21� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Earlysville Forest Dam #1 & #2 repairs — E &S [WP02008000951 Plan preparer: Kurt M. Goeckner PE PLS, [fax 293 -7612] Owner or rep.: Earlysville Forest Homeowners Association Inc. [email jacobvanderhorn@embarqmail.com] Plan received date: 1 October 2008 Date of comments: 21 October 2008 Reviewer: John Diez, Current Development Engineering Technician The plan for Earlysville Forest Dam #1 & #2 submitted 1 October 2008 has received Engineering review. The plan does not appear to contain all the minimum information for a complete review. The following comments are submitted to help with the approval process: General Review Comments 1. Limits of clearing and grading are shown for dam #2, but not for dam #1. Please make sure the Limit of Clearing include the travelway from a public or private road. 2. On sheets 2 & 4, contours seem to stop or intersect with one another. Please make sure the topography is accurately depicting the site conditions. The County GIS is a free downloadable service for plan preparation. http: / /gisweb.albemarle.org/ 3. A letter of intent and construction easement is required from the property owner from pond #2.. Erosion & Sediment Control Plan Comments 4. Silt fence running perpendicular to the contours defeats the purpose and design of the silt fence and becomes a diversion. Please show E &SC perimeter controls in accordance with VESCH. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact one of the Engineering reviewers at 434 - 296 -5832 or email <mailto:apflaum @ albemarle.orq> to schedule an appointment. Albemarle County Community Development Engineering Review Comments Page 2 of 2 \\ Cob- dts01 \cityviewlnk\Docs \2008 \WPO \WPO200800095 - Earlysville Forest Dams #1 &# 2 (repairs)\E1_esc_JPD_08_095.doc