Project: Montessori Community School [SDP200800098, WP0200800065]
Plan preparer: Alex Forast6 [email: aforaste @mckeecarson.com]
Owner /Applicant: Wendy Fisher [email: wendyfisher@montessoripantops.co
received date: 11 June 2008
Rev 1:
Date of comments:
Rev 1:
Reviewer:
Rev 1:
A. Final Site Plan -
2 October 2008
29 July 2008
24 November 2008
Jonathan Sharp
John P. Diez
Phase 1
1. All final site plans and stormwater management plans require a professional seal, signed and
dated. [18- 32.6.1]
(Rev. 1) Comment has been addressed
2. Proposed slopes steeper than 3:1 require low- maintenance (not grass) ground cover specified on
the plans. [DM]
(Rev. 1) Comment has been addressed
3. The proposed guardrail should be extended 40 -50 ft north along the steep slopes for safety. [18-
32.7.2]
(Rev. 1) Comment has been addressed
4. The following ordinance requirements are not met for the temporary parking area: [18 -4.12, DM]
a. proposed parking spaces exceed 5% in slope (Amelia)
b. proposed travelways exceed 10% in slope (no)
c. proposed parking area does not meet surface material requirements (no)
d. curb and gutter is not proposed on all parking /travelway areas (Amelia)
e. sidewalks are not concrete, do not maintain 5' in width (Amelia)
I understand that the proposed parking area is temporary. However, waivers must be approved in
order to approve the site plan as shown. I cannot find any previous waivers addressing these items.
Please provide copies of existing waivers addressing the proposed parking layout, if any.
Otherwise, please submit a waiver request, or meet all ordinance requirements. If required, the
waiver process is administrative (does not require Planning Commission action.)
(Rev. 1) Comment has not been addressed. Thefive waiver requests have been denied. The
existing non - conforming parking may remain in its current state. Any changes to the parking,
including additional parking or realignment of the spaces is required to meet the ordinance
requirements.
5. A portion of the parking area drains uncontained down the steep hillside as it bypasses the
proposed curbing. Please direct all drainage away from the steep hillside to avoid potential
drainage and erosion problems. [ 18- 32.6.6d]
(Rev. 1) Comment has not been addressed. Please provide proposed curbing all the way to the
southwest corner of the parking lot.
Albemarle County Community Development
Engineering Review Comments
Page 2 of 3
6. Typical sections for proposed channels with locations referenced from plan view sheets are
required on the plans. [DM]
(Rev. 1) Comment has been addressed. However, please be advised that the section is D -8, not
C -8.
7. The Albemarle County general construction notes are required on the plans. [DM]
(Rev. 1) Comment has been addressed
8. Grate types for drop inlets must be specified on the plans. [DM]
(Rev. 1) Comment has not been addressed. We cannot endorse product brands. Please add
"....or approved equal" to this note.
9. Roof drain locations, profiles, and calculations are required. See also comment 12. [DM]
(Rev. 1) Comment has not been addressed. We are concern that the gutter system will not hold
a 10 year storm; hence, not making it to the cistern.
10. Drainage profiles for proposed channels, existing pipes, and proposed pipes must be provided on
the plans. [DM]
(Rev. 1) Comment has been addressed
11. Drainage computations are substantially incomplete. The drainage areas provided for the pipe
computations are incorrect. Inlet drainage area maps are required. Drop inlet calculations are
required. Culvert calculations are required. Ditch computations are required. Outlet protection
calculations are required. [DM]
(Rev. 1) Comment has not been addressed. Culvert calculations are needed for EX -1. Drop
inlet calculations are needed for ADS inlets to show that appropriate head over the grates have
been provided for at each structure.
B. Stormwater Management Plan
12. In order to utilize the cistern for detention, details and calculations for the gutter system must be
provided to ensure that the system will actually convey the 2 and 10 year storm into the cistern. If
the 2 and 10 year storm does not make it into the cistern, the cistern is not providing any detention.
Detention storage and routings must be over and above the assumed initial storage volume and the
required stormwater quality volume (i.e., storage and routing begins above assumed volume of
40% and also above the required water quality volume, in this case about 7 cu yds, or about 1500
gallons. [DM]
(Rev. 1) Please also see Comment 9. Generally, the building code standards that buildings are
designed for do not pass storm intensities of 6.7 in/hr. If detention is provided for in the cistern,
you must show that the rooftop system is sized to pass such a storm. The routing must be
started at the water quality elevation assuming that the area for water quality is full.
13. No details of the cistern have been provided. Cistern details are required, matching stormwater
computations. The details should be to scale, provide all invert elevation information, outlet
structures, etc. An adequate depth of soil cover should be provided over the facility. [DM]
(Rev. 1) Comment has not been addressed. Please provide more graphical information for the
orifice inverts.
14. It appears that the overflow pipe for the cistern will be running uphill. [DM]
(Rev. 1) Comment has been addressed
15. The routing model and results are required for the cistern. No hydrographs have been provided.
[DM]
(Rev. 1) Comment has not been addressed. Your routing does not match your plan cistern
overflow.
Albemarle County Community Development
Engineering Review Comments
Page 3 of 3
16. The critical duration computations are incorrect. The calculations provided in the VSMH are only
for preliminary facility sizing, and are not based on the facility volume or outlet structures. The
critical duration storm is also dependent on the areas bypassing the facility (as you are calculating
the critical duration storm causing the peak rate of runoff for the entire watershed, not simply the
facility). In this case, the area bypassing the facility represents 95% of the drainage area. In cases
like this, the critical duration storm that represents the peak rate of runoff over the watershed will
almost always be 0 minutes (because almost all of the runoff is unrouted, and the peak rate of
runoff for an unrouted watershed always occurs at a critical duration of 0 minutes). [DM]
(Rev. 1) Comment has been addressed.
17. Albemarle County general stormwater notes are required on the plans. [DM]
(Rev. 1) Comment has been addressed
18. The stormwater maintenance agreement associated with Montessori School may need to be
updated. The proposed SWM facility appears to be located on TMP 12A. Please contact Pam
Shifflett to verify whether or not the agreement requires to be updated.
(Rev. 1) Comment has been addressed
19. A SWM bond will be computed by the County once the plans have been approved. Please provide
a cost estimate for the proposed cistern.
C. Erosion and Sediment Control Plan
20. The limits of clearing and grading must include all proposed demolition. [DM, VESCH]
(Rev. 1) Comment has not been addressed.
21. A parking area, staging area, and stockpile location are required. [DM]
(Rev. 1) Comment has been addressed
22. The embankment for the proposed trap must be flat. [VESCH]
(Rev. 1) Comment has not been addressed.
23. An adequate channel analysis [MS -19] must be provided for the site. The existing pipe system
from structure OF -3 to the outfall into the Luxor Pond must be analyzed for adequacy. Existing
drainage structure information and drainage area maps should be included with the approved
Pavilions at Pantops Site Plans and Luxor Road and SWM plans, and can be made available upon
request at the County Office Building Department of Community Development. [DM, VESCH]
(Rev. 1) Comment has not been addressed. Please verify drainage area of the pipe system for
Rolkin Road.
24. An ESC bond will be computed by the County once the plans have been approved.