HomeMy WebLinkAboutSDP200800130 Review Comments Final Site Plan and Comps. 2008-11-12c��pF AL &FA9'P
�'IRGINIP
County of Albemarle
Department of Community Development
Memorandum
To: Ammy George
From: Gerald Gatobu, Senior Planner
Division: Zoning and Current Development
Date: November 12, 2008
Subject: SDP2008 -00130 University of Virginia Long Term Acute Care Final
The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of
the final site plan referred to above once the following comments have been addressed: [Each comment is
preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise
specified.]
❑ 32.5.6 The preliminary /final site plan shall contain the following information:
❑ b. Written schedules or data as necessary to demonstrate that the site can accommodate the proposed use,
including:
Schedule of parking including maximum amount required and amount provided; [will be
addressed by the Zoning Administrator per the parkin sg tudyl. Additionally, there are about two parking
spaces that extend beyond the property line of TMP 59 -23B into TMP 59 -23B 1.Section 4.12.16.b
Design of spaces. All parking spaces shall be designed so that no part of any vehicle will extend over
any lot line, right -of -way line, sidewalk, walkway, and driveway or aisle space. Please consider
redesigning the parking spaces close to the concrete loading and utility area. More Parking Spaces
extend beyond the boundary line. Boundary line was extended. I will talk to Amelia to see if the waiver
will be sufficient for the new extensions caused by the new boundary line.
LIGHTING PLAN REVIEW CHECKLIST
El
Lumen level (3000 or more must be full cutoff) Cut Sheets have been
provided. This has been addressed.
Bulb/lamp location (must be totally within house to be full cutoff)
Please note
Luminaire schedule
Catalog # coordinated with cut sheets
Luminaire schedule has been included. The catalog# and the cut sheets
match, except for the fixture MWB. MWB is similar to MWC but the cut
sheets are different [One of the cut sheets is not labeled for the type, and
MWB seems to be the only fixture type without a cut sheet. Ordering /catalog
numbers are different on the cutsheets. Please clarify /revise.
F-1
Fixture quantity /types coordinated with quantity /types on lighting plan
Consider breaking down the fixtures shown per the property or site e.g.
Fixtures in TMP 59 -23BI and those in TMP59 -23B. Fixture quantity /types
do not coordinate with quantity /type on the lighting plan. See Seig lighting
plan for direction.
F-1
Pole height/mounting height (ARB)
Not Applicable
Colors /finishes (ARB)
Not applicable
Tilt (must be 0 for full cutoff)
Please make sure all fixtures are full cut off.
Fixture locations
EJ
Location conflicts with trees, utilities, etc.
The location of the lights must /shall not conflict with trees and utilities. The
boundary of TPM 59 -23BI shown on the lighting plan is incorrect. A
boundary line adjustment was done and the lighting plan needs to reflect the
change. This has been addressed, thank you!
El
Coordination with other site plan sheets
The proposed fixtures need to be shown on other site plan sheets to make
sure that there are no conflicts.
El
Shielding issues (freestanding signs, wall fixtures, etc.)
Please note that all future /intended freestanding signs, and proposed wall
fixtures must be shielded.
Photometric plan
El
Adjacent zoning
This does not raise any issues /comments
0
Property lines
Boundary Line Has been moved. Please reflect this change on the proposed
boundary line adjustment.
0
Excessive spillover
There is an area by the access easement that has excessive spillover i.e. >0.5
ootcandles.
0
Excessive lighting levels (ARB)
Not applicable
F-1
Maintenance factor = 1.0
Maintenance factor should be I.0 This has been addressed thank you.
El
Standard lighting notes
Thank you. (I found the note on page C2)
Landscape Plan Checklist
Comments
TMP 59 -23B 1
Symbols in the key (Planting schedule for 23B1) and the trees they represent on the site plan do not match.
■ 9 AA Amelanchier X Grandiflora Autumn Brilliance 10 year canopy figure is not counted i.e. missing
from the calculation — (1170)
■ Note on the plan indicates 3 QP when there are only 2 QP
■ I counted 80 VBC and not 75 as shown on the planting schedule.
■ 10 Canopy Coverage for IVLV is incorrect. 10 year canopy for the Henry Garnett Sweet spire is 64
■ Counted 106 IG and not 104
TMP 59 -23B
■ Only 3 CCL. Boundary line has been moved.
■ Only 9 CL and not 22
■ FGMA should be FG? Coordinate the Key with what is on the site plan.
■ Counted 26 FGS and not 15
■ IG (24) not on the same TMP. The Boundary line moved.
■ 26 PVS should be PV? Coordinate the Key on the planting schedule with what is shown on the site plan.
Conservation plan checklist needs to be checked. It is signed but not checked.
Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext.3385 for
further information.
3