Loading...
HomeMy WebLinkAboutSDP200800155 Review Comments Final Site Plan and Comps. 2008-12-09� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Restoration of Montalto — Final Site Plan SDP200800155 - Water Protection plan WPO200800099 Plan preparer: Draper Aden Associates -Julia Skare [fax (434) 295 -2105] Owner or rep.: TJF REALTY LLC [fax Unknown] Plan received date: 14 October 2008 Date of comments: 9 December 2008 Reviewer: Max Greene The plans for the Restoration of Montalto received 14 October 2008 have received Engineering review. The plans cannot be approved as submitted. Please refer to the Albemarle County Design Standards Manual for the checklist, details and notes required for approval. The following items will be adequately addressed prior to final approval: A. SDP200800155: 1. The date and source of the topographic information: All topography should be at least visually field verified by the designer within the last year. [18- 32.6.6, 14- 302, Policy for date] 2. All slopes 25% and over (critical slopes by County Zoning Ord.) are shaded [18- 32.6.6, 14 -302] 3. Proposed slopes steeper than 3:1 have low maintenance (not grass) ground cover specified on the plan [Policy] 4. Safety railing shown for retaining walls over 4' high (building permit may be more strict) [Policy] 5. Labels on all drainage structures provided (and should match the drainage computations and profiles) 6. Details for any pipes or drainage structures through or under walls, showing endwalls, casings, or structural measures to bridge pipes or structures will be shown. 7. If there will be Pavement markings, please show them dimensioned and labeled. 8. If there will be Signs for traffic control, please show and label. B. WPO200800099 1. Erosion and sediment control narrative does not appear complete /correct. Please use the Albemarle County Design Manual Check list and the VESCH for required items of approval. Acres of disturbance and all E &SC measures will be bonded prior to issuance of the Grading Permit. 2. E &SC notes will be corrected to match the Design Manual. Engineering Review Comments Page 2 of 2 3. Wind erosion will be a concern with this project. Please show the (DC) Dust Control symbol on the plans and in the Legend. 4. Silt fence appears to be out of compliance with State law. However, the limitations due to excessive slopes may allow the County Engineer to grant a variance allowing the use of Wire - Supported Silt Fence in conjunction with a stone weir outlet to relieve the hydraulic pressure of the impounded stormwater. If proper perimeter controls cannot be shown in accordance with VESCL, then please submit a variance request to the County Engineer for modifications to the requirements. 5. Please show the stockpile locations on the plan and the E &SC measures to protect them. 6. Blanket and Matting is strongly recommended on all slopes over 25 %. 7. No work will be allowed within 5 feet of proposed drip edge of the Tree Protection per VESCH Std. & Spec. 3.38. If the Tree Protection is not a requirement of the County or other Agency, it is recommended they be removed from the plans and included in the contract documents with the contractor. Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. File: E1_ esc,swm,fsp_MRC_Restoration of Monlalto.doc