Loading...
HomeMy WebLinkAboutARB200800093 Review Comments Major Amendment, Final Site Plan 2008-10-16COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 16, 2008 Timmons Group c/o Ammy George 919 2nd St SE Charlottesville VA 22902 RE: ARB- 2008 -93: Moser Radiation Therapy Addition (Tax Map 59, Parcel 23C) Dear Ms. George: I have reviewed your recent submittals, which consisted of the following: exterior elevations sheet dated 9/17/08, site plan sheets C1 -C7 with revision date of 8/19/08, landscape sheet L1 with revision date of 9/18/08, Lighting plan L2 with revision date of 4/15/08, Elevations L1 and L2 dated 9/10/08, and color rendering undated). I have the following comments: 1. Two magnolias are proposed in close proximity to the addition. If the trees will not be revised to a smaller species, the plan should be revised to show them located far enough away from the building to allow for proper growth. The Sweetbay Magnolia can grow to 20' high and 20' wide. Please shift the magnolias further from the building. 2. The plant schedule indicates that four Magnolias are proposed. I can only find two on the plan. Please revise the plant schedule accordingly, or let me know where the other Magnolias are located on the plan. 3. A total of 90 Ilex Glabra are listed in the plant and biofilter schedules. I count a total of 92 on the plan. Please double -check the count and revise the schedules or plan if you find a discrepancy. 4. Columnar English Oaks with groups of holly are proposed for the east side of the addition. The cluster concept addresses one of the ARB's concerns. However, the Oak trees can grow 50' -60' high and 10'- 18' wide. This mature height seems overscaled for the building and the proposed spacing is so close that the clustering won't have an impact. A tree that grows to a shorter mature height, as recommended by the ARB at the August 4 meeting would be appropriate. Please revise the plan so show a smaller species and double check the spacing and distance from the wall to allow for proper growth. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: ARB File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: DATE: PROJECT NAME: ARB- 08 -57: Moser Radiation Therapy Submittal Type Requiring Revisions t > indicates submittal code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 M. Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2008 -0093 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 M. Maliszewski