Loading...
HomeMy WebLinkAboutSDP200800142 Review Comments Major Amendment, Preliminary Plan 2008-10-20 (3)II COMMONWEALTH of VIRC NIA DEPARTMENT OF TRANSPORTATION CHARLOTTESVILLE RESIDENCY OFFICE 701 VDOT WAY CHARLOTTESVILLE, VA 22911 DAVID S. EKERN, P.E. COMMISSIONER October 7`", 2008 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments October 9`I', 2008 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the October 9`", 2008 Site Review Committee Meeting: SDP - 2008 -00066 Hunters Way Site Plan Amendment -Maior (Megan Yaniglos) 1. Stippled area needs to be shown to the edge of pavement on Route 1146. 2. All other comments provided in the June 19'h, 2008 site review letter from VDOT have been adequately addressed. SDP - 2008 -00135 BB &T Bank (Crozet) -Maior (Megan Yaniglos) 1. The proposed bank site will generate 592 weekday trips, 110 VPH in the PM peak hour, and 171 VPD on a Saturday according to the ITE trip generation numbers. 2. This site does not exceed the number of trips to require a Chapter 527 study 3. The site will use an approved entrance from Route 250 in connection with the Blue Ridge Shopping site plan. SDP - 2008 -00136 Airport Road Office Plaza - Preliminary (Elizabeth Marotta) 1. This site will produce about 100 VPH in the peak hour into the site from the intersection at Airport Road. The build out traffic for Timberwood needs to be added to the plan to determine if a right turn lane is warranted. If the build out traffic on Timberwood exceeds 150 VPH a right turn lane will be warranted. 2. An entrance profile in accordance with the CG -11 standard needs to be shown on the plan. 3. The sidewalk needs to be adjusted with the shift in the entrance location and CG -12's need to be added at the entrance. SDP - 2008 -00139 Green House Coffee - Preliminary (Gerald Gatobu) 1. The existing slot drain needs to be replaced with curbing and tied into the curbing on the adjacent site. 2. The right of way on the southern side of the property should be adjusted off the centerline of Route 810 and lined up with the right of way on the northern side of the property. 3. The length and width of the proposed entrance will cause accessibility issues for two way traffic on the site. WE KEEP VIRGINIA MOVING SUB 2008 -00219 Kia Dealership -Final (Megan Yaniglos) 1. No comments Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency 434 - 293 -0011 cc Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell, Judith Wiegand, Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Summer Frederick, Patrick Lawrence, and John Giometti WE KEEP VIRGINIA MOVING