RE: ARB- 2005 -131: Hollymead Town Center Area C, Block 9, Timberwood Blvd and Northwest
Corner Buildings: Final Review of a Site Development Plan (Tax Map 32, Parcel 41D)
Dear Mr. Roell:
I have reviewed your re- submittal (including sheets T1.0 dated 12/6/05 with Bega floodlight cut sheet; A1.0 dated 11/23/05;
A1.0B dated 12/12/05; Al.l dated 11/23/05; A2.0 Building A dated 11/23/05; A2.0 Building C dated 9/6/05; A2.1 dated
11/23/05; A2.2 dated 9/6/5; and A2.3 dated 12/12/05) for the above - referenced proposal. The review was based on our letter
dated December 2, 2005, which outlined the ARB's conditions of approval for this project. My comments are listed
below. Please read this entire letter and follow the instructions at the end.
Regarding the Timberwood Blvd. buildings (Buildings A and B):
1. Regarding li hg Ling:
• A lighting plan was not submitted, so a complete review of the proposed lighting cannot be accomplished.
o Submit a lighting plan. Include on the plan quantity, type, location, wattage, etc. of all proposed light
fixtures.
Uplights exceeding 3, 000 lumens are proposed for the tower. These do not meet ordinance requirements and
cannot be approved.
o Propose alternate fixtures that emit less than 3,000 lumens for the tower. Provide copies of the cut
sheets for the fixture. Indicate color and finish in a lighting schedule.
Uplights are proposed for the covered walkway. A note on T1.0 indicates that the fixtures will be completely
concealed from view from the outside, but the north elevation of the walkway canopy shows that the ends of
the structure are not fully enclosed. A section of the canopy together with the light fixtures, and possibly a
revised side elevation or other detail drawings as necessary, are required to show that the light fixtures will
not be visible from outside the canopy.
o Provide a section, and other detail drawings as necessary, showing the canopy together with the light
fixtures. The drtawings must show that the fixtures will not be visible from outside the canopy, or
alternate fixtures that emit less than 3,000 lumens must be proposed. Provide cut sheets for the canopy
fixtures. Indicate color and finish in a lighting schedule.
• No information on street lights was included in the submittal.
o Provide a street lighting master plan for Area C with complete information on the proposed street
lights, or indicate in writing that street lights are no longer proposed.
2. Re arding materials /colors:
• Sheet TI.0 indicates that the roof of the tower is to be Type H standing seam slate blue. The ARB approved
color for the tower was charcoal gray. Sheet A2.0 notes standing seam metal for the roofs of Building A, but
the color is not specified. It should be charcoal gray. Sheets A2.2 and T1.0 don't indicate tower
materials /colors. The tower structure should be charcoal gray. The finish schedules on the elevation sheets do
not specify stucco colors. The approved stucco colors are sandstone for Buildings A and B and twilight and
gray dawn for Building C. ARB approved Building C brick was Old Salem. Most of the stucco previously
shown on Building C has been changed to brick, including Abingdon, Rosewell and Newport. Samples of these
bricks have not been provided for review. With this change in materials, the elevations should clearly show
that the upper parts of each of the walls of Building C, where the clerestory windows are proposed, are to be
faced with stucco.
o Indicate on the elevations that the tower structure and roof are to be charcoal gray. Coordinate this
information throughout the architectural drawings. Revise the finish schedules to note the ARB
approved stucco colors: sandstone for Buildings A and B and twilight and gray dawn for Building C.
Provide the following brick samples for review: Abingdon, Rosewell, Newport. Revise the Building C
elevations to clearly show that the clerestory walls of Building C will be faced with stucco.
3. Regarding signage:
• The sign criteria were not included in the submittal. The ordinance requires that the ARB conduct a
comprehensive sign review for this type of development prior to site plan approval. The ARB does not need to
know the tenants that will occupy each space. You can simply decide the type of sign that will be used, choose
a color or limited colors for the signs, show the locations for signs on the building, etc.
o Provide sign criteria for review. Include in the criteria: sign type (panel); mounting (hanging, direct to
wall); illumination (external, with proposed fixture type); proposed color range (providing consistency
and coordination throughout building groups). Signs should be coordinated within building groups.
Building groups are as follows: a) the corner element and flat roofed building, b) the flat roofed stucco
building, c) the two groups of three similar building forms; proposed sign areas drawn to scale on the
buildings.
Regarding the northwest corner building (Building C):
1. Regarding the window glass
• A sample of the window glass was submitted but the reflectance value has not been indicated.
o Add the manufacturer's specification for the reflectance value of the glass to the information in the
material schedules. Reflectance shall be held below 7 %.
2. Re arding the coordination of plan and elevations and window placement
• An architectural plan was not submitted for Building C, so this review could not be completed.
o Provide architectural floor plans for Building C. Be sure that the plan shows coordinated elevations and
floor plans regarding window placement.
4. Regarding signage:
• The sign criteria were not included in the submittal. The ordinance requires that the ARB conduct a
comprehensive sign review for this type of development prior to site plan approval. The ARB does not need to
know the tenants that will occupy each space. You can simply decide the type of sign that will be used, choose
a color or limited colors for the signs, show the locations for signs on the building, etc.
o Provide sign criteria for review. Include in the criteria: sign type (panel); mounting (hanging, direct to
wall); illumination (external, with proposed fixture type); proposed color range (providing consistency
and coordination throughout building groups).
Please provide:
1. Two copies of revised drawings addressing each of the items in bold, above.
2. A memo indicating specifically how each condition has been satisfied. If changes other than those
requested have been made, specifically identify those changes in the memo, also. Clear, specific, and
accurate information will facilitate the review of your submittal. The submittal will not be reviewed
without this memo.
3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to
ensure proper tracking and distribution.
When staffs review of this information indicates that all conditions of approval have been met, a Certificate of
Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret M. Maliszewski
Design Planner, Planning Department
Cc: Francis MacCall
File
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to fit into legal size files, in order to be accepted for submittal.
TO:
DATE:
PROJECT NAME: Hollymead Town Center Area C Block 9 Building C
Submittal Type Requiring Revisions () indicates submittal code
County Project Number
# Copies
Erosion & Sediment Control Plan (E &S)
# Copies
Distribute To:
Mitigation Plan (MP)
2
M. Maliszewski
Waiver Request (WR)
Stormwater Management Plan (SWMP)
Road Plan (RP)
Private Road Request, with private/ public comparison (PRR)
Private Road Request — Development Area (PRR -DA)
Preliminary Site Plan (PSP)
Final Site Plan (or amendment) (FSP)
Final Plat (FP)
Preliminary Plat (PP)
Easement Plat (EP)
Boundary Adjustment Plat (BAP)
Rezoning Plan (REZ)
Special Use Permit Concept Plan (SP -CP)
Reduced Concept Plan (R -CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D -GWMP)
Final Groundwater Management Plan (F -GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB- 2005 -131
2
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
M. Maliszewski
*Unassigned (in County Project Column) — Intake to assign a new Application Number