Loading...
HomeMy WebLinkAboutSUB200600113 Review Comments Road Plan and Comps. 2008-12-10� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date Date of comments: Reviewer: Hollymead Town Center Drive DDR HM Acquisition Group LLC 5 Nov 2008 10 Dec 2008 Glenn Brooks A. Road Plan (SUB200600113) VDOT approval is required. The county is finished review. Please provide four copies of the plan VDOT approves. All entrances are not approved, and I will note on the plan that they are built at the owner's risk. I will red -line sheet R10 with the additional street trees required, and that will be our approved version. B. Erosion Control Plan (WP0200800086) This plan is approved, when the resubmittal fee of $300 is paid. Please provide two additional copies, and I will have the inspector replace the currently active plan. Seeing as how the project is well toward completion, further details are unimportant. C. Stormwater Management Plan (WP0200800016) 1. Please pay the resubmittal fee of $300 dollars. Please also pay the fee for the next revision. 2. Please use a 24hr storm distribution for your routings. The basins do not appear to meet ordinance requirements for the 10yr storm. 3. Specify plantings for aquatic benches. 4. Move the outlet structure on basin 6 to the north so the flow path is longer. These basins can be approved for the road plan, but additional measures will be needed for future development in these watersheds. (I get higher water quality volume requirements, and lower provided.) File: E7_ rp,esc,swm_GEB_TowncenterDr.doc