Loading...
HomeMy WebLinkAboutSDP200800169 Review Comments Final Site Plan and Comps. 2008-12-02vIRGIN� County of Albemarle Department of Community Development Memorandum To: Valerie Long (vlong @williamsmullen.com) From: Megan Yaniglos- Senior Planner Division: Zoning & Current Development Date: December 2, 2008 Subject: SDP - 2008 -169- Eckman Property- AT &T- Tier II PWSF- Final The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. [5.1.40(d)(5)] Indicate on the plan sheets the maximum base and top diameter of the monopole. The base shall not be more than 30" in diameter and the top shall not be more than 18" in diameter. 2. [5.1.40 (a)(4)(e)] Show the topography within two thousand (2,000) feet of the proposed facility, in contour intervals not to exceed ten (10) feet for all lands within Albemarle County and, in contour intervals shown on USGS topographic survey maps or the best topographic data available. This topography can be the Counties GIS or from USGS maps. 3. [5.1.40 (c)(2)(ii)] Will there be any outdoor lighting for the maintenance of the facility? If so, all outdoor lighting shall be permitted only during maintenance periods; regardless of the lumens emitted, each outdoor luminaire shall be fully shielded as required by section 4.17 of the zoning ordinance. Provide information on the lighting for the facility. 4. [5.1.40 (d)(8)] On sheet A -1 it appears that the wiring and cables for the equipment are located on the outside of the pole. However, it is required that metal monopoles be constructed so that vertical cables, wiring and similar attachments are contained within the monopole's structure. 5. [32.5.6 (1)] There is an existing monitoring well shown on sheet A -1. Who owns /maintains this well? The County's Groundwater Manager did not believe it was the Albemarle County. Contact the monitoring entity of the well to make sure they are aware of the construction of this facility over the well, and will allow the facility to be located over the well. The type of access over the well will need to be determined by the monitoring entity. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext 3004 for further information.