County of Albemarle
Department of Community Development
Memorandum
From: Max Greene, Current Development engineering review
Date: 11 -14 -08
Subject: St. Anne's Belfield Preliminary Site Plan (SDP200800147)
The preliminary site plan has received a second review. Items required for Preliminary approval appear
adequately addressed. The following list of comments will be addressed in the final plan review phase:
1. All plan pages will have congruent information. The current discrepancies between page of the
submittal will be corrected.
2. Sheet CO.1 Notes # 5 and #6 will be completed. Note #5 appears to have information missing and
note #6 appears to refer to pipes, but is not clear.
3. All proposed roadwork will have 50' stationing shown on the road plan and profile.
4. Edge of pavement will be labeled (where there is no curbing) and a few radii are still missing from
the road plans.
5. Please show and label all utility crossings on the profiles for verification of adequate placement
and separation.
6. Sight distances will be shown on all entrances in accordance with VDOT standards.
7. All sidewalks will be a minimum 5' wide unless modified or waved by the agent. [18- 32.3.10]
8. Drainage structures will be congruently labeled on all pages and submittals.
9. Professional seal, signed and dated is required prior to final approval. [18- 32.6.1]
10. All applicable notes supplied in the County Design Manual will be shown on the plans.
11. VDOT Pavement design work sheets will be submitted for approval.
12. " Stormwater Maintenance Agreement" and fee required for final approval. [17 -304E]
13. VDOT approval is required for final approval.
14. Typical sections for proposed channels with locations referenced from the plan view sheets.
15. Stormwater pipe will be a minimum 15" diameter for inspection and maintenance. The County
Engineer may allow a 12" pipe with adequate justification for the variance.
Please refer to the Design Manual minimum checklist for additional items required for final approval
before resubmittal.
Water protection review is not a part of preliminary review and will be sent in accordance with The
Virginia Erosion and Sediment Control Law.
file: E2_psp_MRG_St. Annes Belfield.doc