HomeMy WebLinkAboutSDP200800040 Review Comments Preliminary Site Plan 2008-12-02*-&A County of Albemarle Department of Community Development Subject: Final Touch Tree Service, Preliminary Site Plan (SDP- 2008 - 00040) The preliminary site plan for Final Touch Tree Service has been reviewed. The engineering review for current development recommends denial to the plan at this time. The following items must be addressed before approval can be recommended: The applicant must show water protection buffers over all water resources on the parcel. The site appears to contain several water resource areas. It is clear that at least one intermittent stream is present on the parcel and, because the site is located in a water supply area, a 100ft buffer exists on this stream. Therefore, the piping of the stream as shown on the plan is not permitted by the Water Protection Ordinance. [17 -321] (Rev. I) Comment has been addressed Please see the attached letter from the County Natural Resources Manager Tamara Ambler. A professional delineation of the water resources on the parcel is recommended before any revision is submitted so that all protected areas are known before redesign. 2. The site appears to have critical slopes. Please identify all critical slopes on the plan. Any disturbance of critical slopes will require a waiver. 3. The site does not appear to be designed to capture stormwater runoff to the maximum extent possible. It appears that close to half of the proposed impervious surfaces leave the site without any treatment. [17 -312C] 4. The applicant needs to provide preliminary stormwater management calculations to demonstrate that the available area for the SWM facility is adequate. 5. Please provide a letter of intent from the owner of TMP 56 -87 permitting work to take place on the property. The letter should also show that owner of the parcel is willing to allow a permanent access easement through the property for the Final Touch site to Route 240. 6. Please show adequate sight distance from the existing entrance onto Route 240. 7. Please provide traffic generation figures for the combined entrance for the self storage facility and the Final Touch Tree Service site. Memorandum To: Summer Frederick, Current Development Project Planner From: Phil Custer, Current Development engineering review Rev 1: John Diez, Current Development engineering review Date: 31 March 2008 Rev 1: 2 December 2008 Subject: Final Touch Tree Service, Preliminary Site Plan (SDP- 2008 - 00040) The preliminary site plan for Final Touch Tree Service has been reviewed. The engineering review for current development recommends denial to the plan at this time. The following items must be addressed before approval can be recommended: The applicant must show water protection buffers over all water resources on the parcel. The site appears to contain several water resource areas. It is clear that at least one intermittent stream is present on the parcel and, because the site is located in a water supply area, a 100ft buffer exists on this stream. Therefore, the piping of the stream as shown on the plan is not permitted by the Water Protection Ordinance. [17 -321] (Rev. I) Comment has been addressed Please see the attached letter from the County Natural Resources Manager Tamara Ambler. A professional delineation of the water resources on the parcel is recommended before any revision is submitted so that all protected areas are known before redesign. 2. The site appears to have critical slopes. Please identify all critical slopes on the plan. Any disturbance of critical slopes will require a waiver. 3. The site does not appear to be designed to capture stormwater runoff to the maximum extent possible. It appears that close to half of the proposed impervious surfaces leave the site without any treatment. [17 -312C] 4. The applicant needs to provide preliminary stormwater management calculations to demonstrate that the available area for the SWM facility is adequate. 5. Please provide a letter of intent from the owner of TMP 56 -87 permitting work to take place on the property. The letter should also show that owner of the parcel is willing to allow a permanent access easement through the property for the Final Touch site to Route 240. 6. Please show adequate sight distance from the existing entrance onto Route 240. 7. Please provide traffic generation figures for the combined entrance for the self storage facility and the Final Touch Tree Service site. Current Development Engineering Review Comments Page 2 of 3 If used for access by the Final Touch site, the aisle on the self storage property will need to be upgraded to the current design standards in the ordinance. Please show all pertinent information regarding this aisle on this preliminary set showing that the aisle will be brought into compliance. Please show a stubout at each end of the parking lot so that vehicles in the last spaces can back out. (Rev. I) Comment has been addressed The following final site plan comments have been provided as a courtesy to the applicant and will not need to be addressed to receive preliminary approval. 1. An analysis of the downstream stormwater conveyance system will be required during the final site plan per MS -19. 2. The fire hydrant and an electric pole appear to need relocation because of the proposed widening on 240. Please show this utility work in the upcoming revisions. 3. All parking lots have a maximum allowable grade of 5 %. (Rev. I) Comment has been addressed 4. The 25ft parking space next to the 18ft handicap spaces will need to be protected by a curbed island or the handicap parking spaces must also be 2511 deep. (Rev. I) Comment has been addressed 5. Drainage easements will need to be shown over all pipes carrying offsite water. 6. Please provide a curb radius near stormwater structure 4. (Rev. I) Comment has been addressed E2_psp_JPD_sdp200800040 Current Development Engineering Review Comments Page 3 of 3