Loading...
HomeMy WebLinkAboutWPO200800059 Review Comments Erosion Control Plan 2008-11-21From: Glenn Brooks Sent: Friday, November 21, 2008 2 To: 'jnixon @deltaairport.com' Cc: 'bhutchinson @gocho.com'; Amy Subject: Airport runway extension (WPO200800059) Jim, 12 PM Pflaum; Philip Custer; Max Greene; Mark Graham erosion and sediment control plan The revised sheets to the Erosion and Sediment Control Plan for the Airport Runway Extension (WPO200800059) received on 18 Nov 2008 have been reviewed. These plans are close enough to compliance that we can grant approval subject to the following conditions; 1. Please provide 4 complete sets of plans with the revised sheets included, and previous plan sheets revised to match (Currently the details, profiles and plans have different pipe sizes, and the details do not match the profiles with regard to pipes entering and exiting risers.) A bond amount will be computed from this set. 2. Provide this note in bold on the plan; "Downstream channels shall be improved and bonded with this plan subject to agreement by the downstream property owner(s). The culverts just downstream shall be improved to at least four 36" pipes or better, with 3' of headwater available, with upstream and downstream transitioning and armoring of the channel. The stream channel shall be armored with rip -rap to the 2yr flow depth for a minimum distance 300 feet downstream of the culverts, or as necessary to stabilize the channel. This condition may be altered with final stormwater management plans." The variance for use of the skimmers instead of wet storage is approved as a necessity for the airport. Thank you, Glenn Brooks, P.E. County Engineer Albemarle County