Loading...
HomeMy WebLinkAboutWPO200700068 Review Comments Erosion Control Plan 2008-12-19� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2007 - 00068, Northfields Phase 4 - Sanitary Sewer, ESC Plans Plan preparer: Mr. Mike Larson, Draper Aden Associates [fax: 295.2105] Owner or rep.: Mr. Jeremy Lynn, ACSA [fax: 979.0698] Plan received date: 31 August 2007 (plan signed 30 August 2007) Rev 1: 18 November 2008 Date of comments: 28 September 2007 Rev 1: 19 December 2008 Reviewer: Andrew Lowe Rev 1: John P. Diez Current Development — Engineering Technician The Erosion & Sediment Control Plans submitted 18 November 2008 have received Engineering Review and meet Albemarle County minimum checklist items for approval. Please submit 4 paper signed and sealed copies of the Plan to Current Development Engineering. A. Erosion Control Plan Narrative 1. Please include a note for Minimum Standard 16 regarding underground utility construction. [VESCH MS -16 & DM] (Rev. I) Comment has been addressed. 2. Please include List 3: General construction notes for Erosion and Sediment Control Plans form the Albemarle County Design Manual page 33. [DM] (Rev. I) Comment has been addressed. Plan 3. ESC approval cannot be granted until we receive copies of signed letters of intent or recorded deeds of easements for each property associated with the project. [DM] (Rev. I) Comment has been addressed. 4. Please label the "Limits of Clearing" on the ESC plan sheet encompassing the entire land disturbance associated with this project. [DM & VESCH checklist] (Rev. I) Comment has been addressed. 5. Show tree protection 5' outside of the actual drip line for any trees to be saved within the limits of grading. Label all trees that will be removed within the limits of grading. [DM & VESCH 3.38] (Rev. I) Comment has been addressed. 6. Please remove the Rock Check Dam (RCD) from the channel at the 550' culvert under the railroad tracks. [DM] (Rev. I) Comment has been addressed. 7. Additional review comments may come on the next plan submittal due to the required changes with this plan submittal. Engineering Review Comments Page 2 of 2 The E &SC bond amount is $19,800 Once the E &SC bond has been posted, you may contact the Department of Community Development to arrange a pre - construction meeting. In addition, should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. E2_esc_JPD_WP0- 2007 -00068 Northfields sanitary sewer