Loading...
HomeMy WebLinkAboutSDP200800142 Review Comments Major Amendment, Preliminary Plan 2008-11-19COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 7, 2008 Dominion Development Resources c/o Justin Shimp 172 South Pantops Drive Charlottesville, VA 22911 RE: ARB- 2008 -138: Hydraulic Wash Tax Map 61 K, Section 5, Parcel 1 A Dear Mr. Shimp, The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, November 3, 2008. The Board, by a vote of 4:0, approved the request, pending staff administrative approval of the following conditions: 1. Revise the plans to show more clearly the outline of the footprint of the existing building on drawings C3 Existing Conditions /Demo Plan, C4 Site and Grading Plan, and the Landscape Plan on C5 Lighting and Landscape Plan. 2. Revise the plans on C4 Site and Grading Plan and C5 Lighting and Landscape Plan to show how the addition will align with the existing building and sidewalk, and be consistent on all the plans. 3. Correct the number of cherry laurels proposed along the north lot line from 14 to 12, as shown on the plan and stated in the plant list. Incorporate shrubs and other planting elements into the landscaping around the trees in front of the proposed and existing building. Correct the number of dwarf bayberry listed in the plant list from 13 to 17. 4. Revise the drawings to show how the cistern and any other elements of the roof rainwater collection system proposed on the north side of the building will be screened. Provide a fence that matches the style and color of the existing fence on the adjacent property. Provide plants on the EC side of the fence. 5. Show utility easements on the landscape plan on Sheet A1.0. If the proposed light fixture is located within the utility easement, provide documentation from the gas company that there is no objection to placing the light fixture in the proposed location. Alternatively, shift the pole out of the easement. 6. Revise the architectural drawings to show the proposed location of the new wall sign and its relationship to the existing structure and signage. Provide complete details on the proposed wall sign and reference the sign checklist for requirements. Provide color and material samples. A non - illuminated or exterior -lit panel sign is preferred. Recognize that the proposed signs will become part of a comprehensive sign guideline for consistency between business signs. 7. Although the existing wall sign is legally nonconforming, the applicant is encouraged to reface or replace it to meet current guidelines. 8. Although the freestanding sign is legally nonconforming, the applicant is encouraged to reface the cabinet sign with appropriate panels that meet the current EC guidelines and eliminate the plywood panels, or replace the freestanding pole sign with an externally -lit freestanding monument sign. The applicant is also encouraged to expand the planting area in this corner of the site. Revise the landscape plan on C5 Lighting and Landscape Plan to show that the existing freestanding sign will not be moved, and change the description of the sign from "Monument Sign" to "Pole Sign" on the plan. 9. Revise Sheet A1.0 Building Plan and Elevations to indicate that the blue trim in the gable and cupola will be painted white. 10. Revise the southeast elevation to include a double window in the front third of the wall. 11. Revise the drawings to show where the laundry vents will be relocated. The vents and all equipment shall not be visible from the EC. 12. The materials and colors as submitted are approved. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, also identify those changes in the memo. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Eryn Brennan Senior Planner Planning Division Cc: Robert B. Anderson, AIA 172 South Pantop Drive Charlottesville, VA 22911 Hydraulic Wash LLC 1560 Robin Lane Charlottesville, Va 22911 File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Ervn Brennan DATE: PROJECT NAME: ARB- 2008 -89: Hydraulic at Georgetown Building Submittal Type Requiring Revisions ( ) indicates submittal code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Eryn Brennan Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2008 -89 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Eryn Brennan