Loading...
HomeMy WebLinkAboutWPO200800060 Review Comments Bond Estimate 2008-11-25 (3)BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised: 12-5-01 PROJECT NAME: Rivanna Plaza PROJECT NUMBER: SDP200800090 DATE OF ESTIMATE: 11/25/08 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.61 $1,500.00 $2,415.00 SILT FENCE LF 1054 $5.00 $5,270.00 SAFETY FENCE LF 689 $3.00 $2,067.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 389 $3.00 $1,167.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 1.61 $1,000.00 $1,610.00 SEDIMENT BASIN 1 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 1 $500.00 $500.00 INLET PROTECTION EA 20 $200.00 $4,000.00 OUTLET PROTECTION EA 0 $200.00 $0.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 2 $2,000.00 $4,000.00 SUBTOTAL 21029.00 CONTINGENCY & ADMINISTRATION LS 25% 5257.25 TOTAL 26286.25 BOND AMOUNT REQUIRED 26300.00