Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800080 Review Comments Bond Estimate 2008-11-24
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Pavilions at Pantops, Phase 3 PROJECT NUMBER: WPO200800080 DATE OF ESTIMATE: 11/24/08 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 10 1500 15000 SILT FENCE LF 200 5 1000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 3330 3 9990 TEMPORARY SLOPE DRAIN LF 222 20 4440 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 33 200 6600 OUTLET PROTECTION EA 2 200 400 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 39430.00 CONTINGENCY & ADMINISTRATION LS 25% 9857.50 TOTAL 49287.50 BOND AMOUNT REQUIRED 49300.00