Loading...
HomeMy WebLinkAboutWPO200800095 Review Comments Erosion Control Plan 2008-12-05IRGINZ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 4126 Project: Earlysville Forest Dams #1 & #2 repair — AT0200800095 Plan preparer: Kurt M. Goeckner PE PLS, [fax 293 -7612] Owner or rep.: Earlysville Forest Homeowners Association Inc. [email jacobvanderhorn @embarqmail.com] Date received: 1 Oct. 2008 Rev.l: 24 Nov. 2008 Date of Comment: 21 Oct. 2008 Rev.l: 5 Dec. 2008 Engineer: John Diez Current Development — Engineering Technician General Review Comments Fax (434) 972- Limits of clearing and grading are shown for dam #2, but not for dam #1. Please make sure the Limit of Clearing include the travelway from a public or private road. (Rev. I) Comment has been addressed 2. On sheets 2 & 4, contours seem to stop or intersect with one another. Please make sure the topography is accurately depicting the site conditions. The County GIS is a free downloadable service for plan preparation. http: / /gisweb.albemarle.org/ (Rev. I) Comment has been addressed A letter of intent and construction easement is required from the property owner from pond #2. (Rev. I) Comment has been addressed Erosion & Sediment Control Plan Comments 4. Silt fence running perpendicular to the contours defeats the purpose and design of the silt fence and becomes a diversion. Please show E &SC perimeter controls in accordance with VESCH. (Rev. I) Comment has been addressed The Erosion & Sediment Control Plans submitted 24 November 2008 have received Engineering Review and meet Albemarle County minimum checklist items for approval. Please submit 4 paper signed and sealed copies of the Plan to Current Development Engineering. The E &SC bond amount is $ 12,100 Once the E &SC bond has been posted, you may contact the Department of Community Development to arrange a pre- construction meeting. In addition, should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. \\ Cob- dts0l\ cityviewlnk \Docs\2008 \WPO \WPO200800095 - Earlysville Forest Dams 1 & 2\E2 esc JPD 08- 095.doc