Project: WPO- 2008 - 00105, BB &T Bank Crozet E &SC Plan
Plan preparer: Mr. William Horton, PE, Hurt and Proffitt, Inc.
Owner or rep.: Mr. Preston Stallings
Date received: 24 November 2008 (plan signed date 18 November 2008)
Date of Comment: 7 January 2009
Engineer: Phil Custer
The E &SC plan for BB &T bank in Crozet, received on 24 November 2008, has been reviewed. The plans
cannot be approved as submitted and will require the following changes /corrections prior to final approval.
After speaking with Joe Turner of Hurt and Proffitt, Inc., engineering review understands that this ESC
plan is to be a stand alone for the bank's portion of the site. The comments below have been written with
the assumption that the Harris Teeter portion of the parcel will be completed by the time the bank
construction begins.
1. Approval of this plan cannot be given until the site plan and pending SP plan are approved.
Any changes to the site as a result of the site or SP plan review should be reflected in this ESC
plan.
2. Please reference the previously approved ESC plans for the shopping center and note that the
site drains to the basin approved with that plan. The title of the previously approved plan is
"WPO- 2007 -00031 Blue Ridge Shopping Center ".
3. Please show portions of the site that are assumed to be already constructed as having existing
contours. All proposed contours should be shown within the limits of construction.
4. The construction entrance and all ESC measures shown should be moved to within the limits
of construction. The limits of construction should not contain any portion of the site open to
the public when Buildings A and B are occupied. The ESC plan should match any phasing
plan to be submitted to the County.
5. Please provide the Albemarle County Standard Construction notes for ESC plans found in the
latest edition of the design manual available online.
6. Please show the pipe from the new inlet to Inlet 106 on the plan.
7. Please show DC and PS symbols on the plan where applicable.
8. A bond amount will be calculated when the plans are approved.
Please contact me at (434)296 -5832 ext. 3072 should you have any questions.