HomeMy WebLinkAboutSDP200800123 Review Comments Final Site Plan and Comps. 2008-11-26Max Greene
From: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov]
Sent: Wednesday, November 26, 2008 9:04 AM
To: Max Greene
Subject: SDP - 2008 -123 Crozet Station Phase I final
SDP - 2008 -123 Crozet Station Phase I final
Max,
I have reviewed the above project and have the following comments:
* Road and drainage plans will be needed for the widening of Route
240.
o Include pavement widening in accordance with VDOT's WP -2
standard.
o Show a proposed pavement structure
o Show existing and proposed drainage structures and pipes.
* More detail is needed on the existing survey to show a proper
tie in for the curbing and sidewalk at each end of the project. This needs to include the
recently completed improvements at the bank site.
* Right of way needs to be set to accommodate proper maintenance
of the road and necessary setbacks. The minimum setback from the face of curb is 8 feet
minimum.
* The minimum radius on an entrance curb is 12.5 feet. The radius
needs to accommodate the design vehicle which may require a larger radius.
* Show an entrance profile in accordance with VDOT's CG -11
standard.
* Use CG -6 instead of CG -2.
* Sight distance lines need to be within the ROW or a sight
distance easement.
If you have any questions, please let me know.
Thanks,
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio @vdot.virginia.gov
No virus found in this incoming message.
Checked by AVG - http: / /www.avg.com
Version: 8.0.175 / Virus Database: 270.9.10/1811 - Release Date: 11/26/2008 8:53 AM
1