Loading...
HomeMy WebLinkAboutWPO200800042 Review Comments Stormwater Management Plan 2008-12-08Page 1 of 1 Philip Custer From: Philip Custer Sent: Monday, December 08, 2008 11:21 AM To: 'Scott Collins' Cc: Amy Pflaum; Patrick Lawrence; Bill Fritz Subject: Engineering Approval of Avon Court WPO Plans Good morning, The Erosion & Sediment Control, Stormwater Management, and Road Plans (WPO- 2008 - 00042) submitted 2 December 2008 have been received by Engineering Review and meet Albemarle County minimum checklist items for approval. Please submit 7 paper copies of the Plan to Current Development Engineering. (These sets are for the inspectors and do not need to include all sheets. Please contact me for a list of the sheets needed if you wish to only print the minimum number of pages.) The E &SC bond amount is $48,000. The SWM bond amount is $39,000. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. Once the E &SC bond and the SWM bond have been posted, you may contact the Department of Community Development to arrange a pre- construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. In addition, Current Development Engineering recommends the applicant request an extension of the preliminary plat approval from the Chief of Current Development, if he has not already done so. The preliminary plat is set to expire in approximately one month. Please let me know if you have any questions. Thanks, Phil 296 -5832 x3072 12/8/2008