Loading...
HomeMy WebLinkAboutSDP200800040 Review Comments Preliminary Site Plan 2008-04-03II COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 David S. Ekern, P.E. VirginiaDOT.org COMMISSIONER April 3rd, 2008 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments April 3rd, 2008 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the April 3rd, 2007 Site Review Committee Meeting: SDP - 2008 -00038 Flow Automotive -Final (Megan Yaniglos) • Adjacent property TMP -78 -15 has a site plan to continue the right turn lane. Effort should be made to coordinate the construction of these sites to minimize traffic interruption and construction costs. • The radius of 13 feet at the east end of the property should be 25 feet and CG -6 should be used. • The flow line at the eastern entrance should be adjusted to allow for future extension of the right turn lane. Sight distance towards the east needs to be shown at this entrance. • The drainage areas need to be checked on the road sections. It appears that the centerline of the road is the divide and this section of road is in a full super section. Structure EX5 needs to be relocated instead of removed and because the spread on EX -4 is greater than the allowable spread. SDP - 2008 -00039 Durkin Property / Verizon Wireless Final (Gerald Gatobu) • No comments SDP - 2008 -00040 Final Touch — Prel. (Summer Frederick) • The sight distance at the existing entrance needs to be shown. • Show the proposed ROW lines. • The final plan will need road and drainage plans. • Any work within the VDOT ROW will need a Land Use Permit. ��i'EARS OF Tit AHSPORiAikOH El[C4LEHCE a 9-D G 2 0 0 6 SDP - 2008 -00041 North Pointe - Northwest Residential -prel. (Gerald Gatobu) • Proffered items under phase III road construction are supposed to be complete prior to this site plan approval. • Proffer V- 5.3.1 -ci is missing from the proffers at the beginning of the plan. • The ingress to the site off route 29 should either be a yield condition or accommodate a proper merge according to AASHTO standard merge lengths. • The egress onto route 29 needs to have a lane configuration and lengths to accommodate the queue from the traffic study queue analysis. • The lane shifts on route 29 need to be a minimum of 720 feet in length. The lane shift on Northwest Passage needs to be in accordance with the design speed of the road. • The CG -6 on the north side of the entrance needs to have a minimum 12 foot offset and an appropriate taper to tie back into the pavement on route 29. • Road and drainage plans will be needed with the final site plan. • A Land Use Permit will be needed for any work within the VDOT ROW. SDP - 2008 -00042 Buck Mountain Episcopal Church / Verizon (Megan Yaniglos) • Sight distance needs to be shown for the connection to Earlysville Road. SUB - 2008 -00076 Old Trail- Ballard Field Townhomes -Phase III (Summer Frederick) • No comments Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Residency Program Manager VDOT Charlottesville Residency 434 - 293 -0011 cc Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell, Judith Wiegand, Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Summer Frederick, Patrick Lawrence, and John Giometti