Loading...
HomeMy WebLinkAboutWPO200800095 Review Comments Bond Estimate 2008-12-05BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised: 12-5-01 PROJECT NAME: Earlysville Forest Dams #1 & #2 PROJECT NUMBER: WPO200800095 DATE OF ESTIMATE: 12/05/08 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.86 $1,500.00 $1,290.00 SILT FENCE LF 363 $5.00 $1,815.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 395 $3.00 $1,185.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0.86 $1,000.00 $860.00 SEDIMENT BASIN 1 ACRES 0 $1,000.00 $0.00 STORM FILTER DAM EA 1 $500.00 $500.00 CULVERT INLET PROTECTION EA 0 $500.00 $0.00 INLET PROTECTION EA 0 $200.00 $0.00 OUTLET PROTECTION EA 0 $200.00 $0.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 2 $2,000.00 $4,000.00 SUBTOTAL 9650.00 CONTINGENCY & ADMINISTRATION LS 25% 2412.50 TOTAL 12062.50 BOND AMOUNT REQUIRED 12100.00