Loading...
HomeMy WebLinkAboutSDP200800135 Review Comments Major Amendment, Preliminary Plan 2008-12-05COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 December 5, 2008 Richard Shank Shank & Gray Architects 510 East Main Street Charlottesville, VA 22902 RE: ARB2008 -00161 BB &T at Blue Ridge Shopping Center Tax Map 56, Parcel 11 Dear Mr. Shank, The Albemarle County Architectural Review Board, at its meeting on December 1, 2008, completed a preliminary review of the above -noted request. The Board took the following actions. Regarding the Special Use Permit /Rezoning, the Board by a vote of 3:0, forwarded the following recommendation to the Planning Commission: The ARB expresses no objection to the special use permit, subject to the following conditions: 1. Replace the 3 Dwarf Burford Holly and 3 Green Luster Holly shrubs, shown in the enlarged northwest corner planting bed, with evergreen shrubs having mature heights of 8' to 10' planted for the full width of the enlarged corner planting bed. Replace the Red Azaleas, shown in the northwest corner of the site, with an evergreen species. Regarding the Final Site Plan, the Board by a vote of 3:0, approved the Certificate of Appropriateness for the above noted petition, pending staff administrative approval of the conditions listed in the staff report, amended as follows: 1. Revise Sheet Al by adding a note indicating the reflectance value of the proposed glass and the method and location of the false window. 2. Revise all site layout sheets, including the landscape plan, to include details of the proposed pole mounted transformer including location of pole, location on the pole, and the overall size and color of the transformer. 3. Revise Sheet C5 Landscape Plan by changing the Red Azaleas, shown in the northwest corner of the site, to an evergreen species. 4. Revise the proposal to show the use of a muntin form on the exterior (EC side) of the glass, with a raised 3 dimensional form and a scale and size that is appropriate for the window. 5. Revise Sheet C5 Landscape Plan by replacing the 3 Dwarf Burford and 3 Green Luster Hollies, shown in the enlarged northwest corner planting bed, with evergreen shrubs having mature heights of 8' to 10' planted for the full width of the enlarged corner planting area. This will require more than the 6 shrubs currently proposed. Provide evidence of a planting easement that would allow for all of the proposed plantings currently shown in the Route 250W right -of -way. Revise the landscape plan /schedule to clarify the identity of the plants currently tagged with an L 15 designation. 6. Revise Sheet C10 Lighting Details to include cutsheets of canopy Fixture K, parking lot Fixture A2, and wall -mount fixture S. Revise the lighting proposal to include an alternate to Fixture S that is a full cutoff design or revise its light source to one that emits less than 3, 000 lumens. 7. Revise the luminaire schedule on Sheet C6 Lighting Plan to indicate the mounting height of all pole and wall- mounted fixtures. A maximum height of 20' would be appropriate for the pole- mounted fixtures. Revise Sheet C5 Landscape Plan to show the location of all proposed light fixtures. Ensure that there are no conflicts with proposed plantings. 8. Revise the luminaire schedule on Sheet C6 Lighting Plan to indicate the proposed color and finish for all proposed poles and fixtures; black or bronze is appropriate. Revise the proposed lighting maintenance factor (LLF) to one (1). 9. One (1) sign is permitted; revise the sign drawings accordingly. Revise the sign drawings to indicate the product color ID for the red acrylic trim caps and returns. Provide a sample of the color. Revise the sign drawing to include a note indicating that the sign raceway will be painted to match the color of the wall to which it will attach. The drawing should also be revised to include the following note: Channel letters with translucent faces shall be constructed such that no light spills outward from the top, bottom, sides or back. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent Nelson Landscape Planner cc: Sara Wingate Lambert Architecture and Interiors 2400 Reynolda Road Winston Salem, NC 27006 Richard Prosser BB &T 6400 Arlington Blvd Falls Church, VA. 22042 Megan Yaniglos, Current Development File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Brent Nelson DATE: PROJECT NAME: ARB2008 -161 BB &T at Blue Ridge Shopping Center Submittal Type Requiring Revisions ( ) indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Brent Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2008 -0161 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Brent Nelson