HomeMy WebLinkAboutSDP200800178 Review Comments Final Site Plan and Comps. 2008-12-11*-&A
County of Albemarle
Department of Community Development
Memorandum
To: Elizabeth Marotta, Current Development Project Planner
From: Phil Custer, Current Development engineering review
Date: 11 December 2008
Subject: nTelos Tower, Dickerson Property (SDP- 2008 - 00178)
The site plan for the nTelos Tower on the Dickerson Property has been reviewed. The engineering review
for current development provides the following comments:
1. The bollard must be moved outside of the clear zone of the roadway.
2. If the driveway is to be modified, please call it out as a VDOT Standard PE -1.
3. Any work on the adjacent parcel will require a letter of intent from the property owner.
4. Engineering review recommends that the existing driveway be upgraded to meet the County's
standard for lot access in Section 18- 4.6.6.b. This is not a requirement.
File: E1_fsp_PBC_sdp200800l78.doc