Loading...
HomeMy WebLinkAboutWPO200600021 Review Comments Bond Estimate 2008-12-16BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Gazebo Plaza - Early Grading - Amendment to Stop Work and Stabilize site PROJECT NUMBER: WPO200600021 DATE OF ESTIMATE: 12/16/08 ESTIMATE BY: MRG BASED ON: Grading Only Plan for stop work and Stabilization. WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 25 1500 37500 SILT FENCE LF 630 5 3150 SAFETY FENCE LF 870 3 2610 TEMPORARY FILL DIVERSION LF 800 3 2400 SCC -1 DIVERSION DIKE LF 370 10 3700 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 25 1000 25000 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 370 10 3700 RIP -RAP SQ.YD. 600 55 33000 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 113060.00 CONTINGENCY & ADMINISTRATION LS 25% 28265.00 TOTAL 141325.00 BOND AMOUNT REQUIRED 141400.00