Loading...
HomeMy WebLinkAboutWPO200800083 Review Comments Bond Estimate 2008-12-18 (3)PROJECT NAME: UVA LTACH FILE #: WPO- 2008 -00083 DATE APPROVED: 5- Dec -08 BMP Type Item Unit Amount Unit Cost Subtotal Filterra 4x6 each 5 $6,400.00 $32,000 Filterra 6x10 each 1 $12,100.00 $12,100 Filterra 6x12 each 1 $14,200.00 $14,200 Filterra Installation per project 7 $14,575 EC -1 outlet protection each 1 $200.00 $200 48" concrete structures each 4 $1,000.00 $4,000 Concrete pipe linear foot 50.00 $25.00 $1,250 Contech CMP underground detention (supplier estimate) $18,000.00 $18,000 Contech 1 in orifice box (supplier estimate) $8,000.00 $8,000 Inlet pipe snouts each 3.00 $700.00 $2,100 ACF Environmental Raintank (supplier estimate) $33,000.00 $33,000 SUBTOTAL $139,425 25% Contingency $34,856 TOTAL $174,281 ROUNDED TOTAL $174,000 MINIMUM TOTAL AFTER REDUCTION $34,800