Loading...
HomeMy WebLinkAboutARB200700151 Review Comments Final Site Plan and Comps. 2008-12-18�� OF ALg �'IRGI131� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 December 18, 2008 VMDO Architects c/o Steve Davis 200 E Market Street Charlottesville, VA 22902 RE: ARB2007 -00151 CTS Operation CTR — Avon Park Tax Mp 77E2, Parcel 3 Dear Mr. Davis: I have reviewed your recent submittal for the above - referenced project received December 8, 2008. The Albemarle County Architectural Review Board, at its meeting on December 15, 2008, addressed issues related to the proposed street trees and the existing overhead power line /easement along the Avon Street Extended right -of -way. In consensus the ARB took the following action: CTS Avon Street — street tree /utility conflicts Regarding the CTS Avon Street street tree /utility conflicts, it was the consensus of the ARB that a more upright plant material should be used in place of the red Maples to avoid impacts to the tree canopy by the power lines. Outstanding issues, in addition to the above -noted action, that will need to be further addressed include: The Southern Magnolia tree is a species that can reach heights up to 80' and widths up to 40'. Replace the Southern Magnolia trees, proposed inside the overhead power easement along the Avon Street Extended right -of -way, with a species whose size will not conflict with the overhead power lines. 2. The Tulip Poplar tree is a species that can reach heights up to 100' and widths up to 50'. Replace the Tulip Poplar species, proposed along the Avon Street Extended right -of -way, with a species whose size will not conflict with the overhead power lines. 3. Make sure the landscape architect who designed your planting plan is aware of the overhead utility lines (with associated easement) and comfortable that their choice of plantings adjacent to the right -of -way will not require pruning by Dominion Power due to conflicts. 4. In this latest submission, Sheet E0.2 Site Boundary Photometric Plan contains the note: All poles and associated light fixtures shall have natural aluminum finish. ARB guidelines require that all site lighting poles and fixtures be either dark bronze or black. Revise the pole lighting note on Sheet E0.2 Site Boundary Photometric Plan accordingly. Please provide: 1. Two sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. You may include only those drawings that are to be revised. Once it can be determined that all issues have been resolved, a complete set of site and building drawings will be needed for ARB signature. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent Nelson Landscape Planner cc: Summer Frederick, Senior Planner (via email) Scott Hendrix, City of Charlottesville (via email) Justin Walton, VMDO (via email) ARB File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Brent Nelson DATE: PROJECT NAME: ARB2007- 151CTS Submittal Type Requiring Revisions ( ) indicates submittal code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Brent Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2007 -00 1 5 1 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Brent Nelson