Loading...
HomeMy WebLinkAboutWPO200700068 Review Comments Bond Estimate 2008-12-19BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised: 12-5-01 PROJECT NAME: NORTHFIELDS - PHASE 4 PROJECT NUMBER: WPO200700068 DATE OF ESTIMATE: 12/19/08 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.6 $1,500.00 $2,400.00 SILT FENCE LF 1985 $5.00 $9,925.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 0 $3.00 $0.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0 $1,000.00 $0.00 SEDIMENT BASIN 1 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 3 $500.00 $1,500.00 INLET PROTECTION EA 0 $200.00 $0.00 OUTLET PROTECTION EA 1 $200.00 $200.00 EC -2 & 3 DITCH PROTECTION LF 175 $10.00 $1,750.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 0 $2,000.00 $0.00 SUBTOTAL 15775.00 CONTINGENCY & ADMINISTRATION LS 25% 3943.75 TOTAL 19718.75 BOND AMOUNT REQUIRED 19800.00