Loading...
HomeMy WebLinkAboutARB200800158 Action Letter 2008-12-19COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 December 19, 2008 Valerie Long C/O Williams Mullen 321 E. Main St. #400 Charlottesville, VA 22902 RE: ARB2008 -00158 Ekman (AT &T) Tax Map 87B, Parcel 4 Dear Ms. Long, The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, December 15, 2008. The Board, by a vote of 4:0, approved the request, pending staff administrative approval of the following conditions: 1. Revise all applicable application drawings to include notes indicating that the monopole, ground equipment, ice bridge, cables, and antennas will be painted SW #6090 Java Brown. Revise the applicable drawings to indicate the proposed diameter of the monopole at the top and base. The base shall be no wider than 30" and the top no wider than 18 ". If a lighting rod is proposed, the applicable drawings should be revised to show its location and dimensions. If one is not proposed, the applicable drawing should be revised to indicate that none is proposed. 2. Install seven (7) Virginia Red Cedars in 2 rows staggered, 12' on center, 6' — 8' tall at planting in the location of the currently proposed plantings. 3. Revise all applicable drawings to accurately show the existing drip line of all five (5) existing trees inventoried and to indicate if site grading is proposed. If none proposed, provide a note on the drawing indicating that no site grading beyond the concrete pad is to occur. Relocate the proposed tree protection as close as possible to the perimeter of the tree canopy it is to protect. Provide written verification from a certified arborist that all proposed grading and the grading and /or digging required to install the concrete pad, monopole, and underground power and telephone lines will not be detrimental to the health of the trees that are to remain. Include any additional recommendations from the arborist for maintaining the health of the trees on the drawings. Provide a tree conservation plan with measures limiting impacts on existing trees to remain. 4. If no additional exterior lighting is proposed, add a note to the applicable drawing indicating that no additional exterior lighting is proposed. If additional exterior lighting is proposed, revise the drawing to show the location, with the following note added to the drawing: The proposed light fixture will be shielded in accordance with Albemarle County requirements and operated by motion sensor. All proposed lighting is for Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent Nelson Landscape Planner Cc: AT &T 4801 Cox Road Glen Allen, Va 23060 BC Architects 5659 Columbia Pike Falls Church, Va 22041 J & F Ekman Inc 3019 Monacan Trail Rd North Garden Va 22959 Megan Yaniglos, Senior Planner File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Brent Nelson DATE: PROJECT NAME: ARB2008 -158 Ekman (AT &T) Submittal Type Requiring Revisions () indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Brent Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2008 -158 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Brent Nelson