HomeMy WebLinkAboutSDP200800121 Review Comments Final Site Plan and Comps. 2008-11-11pF AL
G.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
November 11, 2008
Justin Shimp
Dominion Development Resources, LLC
172 South Pantops Drive
Charlottesville, VA 22911
RE: ARB- 2006 -136: Luxor Commercial, Buildings 1, 3, and 7
(Tax Map 78, Parcel 55D and 55A4)
Dear Mr. Shimp:
I have reviewed your revised submittal for the above - referenced project which consisted of the following:
Drawinjzs:
Sheet C -1 Cover Sheet, latest revision date 11/5/08
Sheet C -2 General Notes & Site Data, latest revision date 11/5/08
Sheet C -3 Proffers, latest revision date 11/5/08
Sheet C -4 Overview /Phasing Plan, latest revision date 11/5/08
Sheet C -5 Demo /Existing Conditions, latest revision date 11/5/08
Sheet C -6 Site Plan, latest revision date 11/5/08
Sheet C -7 Grading & Utility Plan, latest revision date 11/5/08
Sheet C -8 Landscape Plan, latest revision date 11/5/08
Sheet C -9 Lighting Plan, latest revision date 11/5/08
Sheet C -9.1 Lighting Plan, latest revision date 11/5/08
Sheet C -9.2 Lighting Details, latest revision date 11/5/08
Sheet C -9.3 Lighting Details, latest revision date 11/5/08
Sheet C -10 Storm Sewer Pipe Profiles, latest revision date 11/5/08
Sheet C -11 Drop Inlet Drainage, latest revision date 11/5/08
Sheet C -12 Utility Details, latest revision date 11/5/08
Sheet C -13 Road Plan, latest revision date 11/5/08
The revisions included in this latest submission address all outstanding conditions of ARB approval. You may
consider this letter your Certificate of Appropriateness.
This approval is predicated on the fact that the design and materials, as proposed and exhibited for review,
will be used. This application is approved with the condition that mechanical equipment shall not be
visible from the Entrance Corridor. The acceptance of approval implies that the applicant has agreed to
execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items
presented. Any change in the approved design or materials will require an amendment to the plan and
must be reviewed and approved by the Architectural Review Board.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Brent W. Nelson
Landscape Planner
cc: Patrick Lawrence, Senior Planner (via email)
Albemarle County
Robert Anderson (via email)
Dominion Development Resources
ARB File