Project:
Plan preparer:
Owner /Applicant:
Plan received date:
Date of comments:
Reviewer:
A. Final Site Plan
Three Notch'd Center [SDP200800179]
NP Engineering [email: nat.perkins@,gmail.co
LLC [email: Unknown]
16 December 2008
26 January 2009
John P. Diez — Engineering Technician
1. Please provide date of topography. [18- 32.6.6, 14 -302, Policy for date]
2. Please state the location of the benchmark on the coversheet.
3. Please provide all existing easements (access, drainage, sight, sanitary easements, etc.) with deed
book references, locations, and dimensions. [18- 32.6.6, 14 -302]
4. Please provide a legend showing all symbols and abbreviations used on the plans.
5. Please provide a VDOT designation (PE -1, CG -9a, etc) to all entrances.
6. Please provide proposed topography on the entrance of the west side of the lot. The entrance
cannot exceed 4% grade for a distance of 40' from the intersected street, measured anywhere in the
entrance. [18- 4.12.17]
7. Please provide sight distance lines at the entrances, less than 10 x speed limit intersected streets,
measured from a point 10' off the edge of pavement of the intersected street.
8. VDOT approval must be maintained for any plan affecting right -of -way.
9. The proposed loading space should be adjacent to the structure and needs to have minimum
dimensions of 12'x25' [18- 4.12 -13]
10. Please label the hatched area by Three Notch' d Road on sheet 5.
11. Sidewalks abutting parking must be 6' wide, or bumper blocks must be provided. Please refer to
the Design Standards Manual.
12. Please provide arrows indicating direction of flow for all existing and proposed storm sewers.
13. Please provide throat length for each drop inlet.
14. Please clarify if STR -6 is a manhole or an inlet.
15. Please provide an end section for the outlet to the stormwater detention facility.
16. Further site plan comments may be required once the stormwater plans and calculations are
reviewed.
B. Stormwater Management Plan
17. Please submit Stormwater Management plans with details and calculations. Please refer to the
Virginia Stormwater Management Handbook.
C. Erosion and Sediment Control Plan
18. Please submit Erosion and Sediment Control plans with details. Please refer to the Virginia
Erosion and Sediment Control Handbook.