HomeMy WebLinkAboutWPO200700091 Review Comments Stormwater Management Plan 2008-12-31Page 1 of 1
Philip Custer
From: Philip Custer
Sent: Wednesday, December 31, 2008 11:10 AM
To: 'hendrix @charlottesville.org'; 'davis @vmdo.com'; 'Doug Minor (mynear @pbworld.com)'
Cc: Summer Frederick
Subject: Engineering approval of the WPO plans for the Charlottesville CTS Facility (WPO200700091)
Good afternoon,
The Erosion & Sediment Control and Stormwater Management Plans (WPO200700091) submitted 24 October
2008 and 08 December 2008 have received Engineering Review and meet Albemarle County minimum checklist
items for approval. A week or two before the applicant requests a grading permit, please submit 6 copies of the
WPO plan. For a list of all sheets required for the WPO plan, please contact me prior to having the set copied.
Please also submit 1 copy of the latest set of Stormwater Calculations and 2 copies of the ESC narrative and
related calculations.
The WPO bond amounts were previously calculated. The E &SC bond amount is $68,000. The SWM bond
amount is $419,000. The forms and instructions to post the Water Protection Ordinance Bond can be found on
the Community Development Department Web site on www.albemarle.ora. You may contact Pam Shifflett
(Albemarle County Department of Community Development) at ext. 3246 for further information on bonding
procedures.
Once the E &SC bond and the SWM bond have been posted and the mylars signed for the site plan, you may
contact the Department of Community Development to arrange a pre- construction meeting with a County Erosion
& Sediment Control Inspector.
Also, although tree protection fencing is shown on the plan, it is not to state standards and it will be the
responsibility of the applicant and their contractor to preserve the required trees during construction. The existing
trees to remain will be monitored by a Zoning inspector during the construction of the site.
Please contact me should you have any questions.
Thanks,
Phil
(434) 296 -5832 x3072
12/31/2008