Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800054 Review Comments Bond Estimate 2008-12-31
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Faulkner Falls Subdivision PROJECT NUMBER: WPO- 2008 -00054 DATE OF ESTIMATE: December 31 th 2008 ESTIMATE BY: PBC BASED ON: WPO plan dated 12 -16 -08 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.5 1500 3750 SILT FENCE LF 760 5 3800 SAFETY FENCE LF 760 3 2280 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 320 3 960 SEDIMENT TRAP 1 ACRES 1.08 1000 1080 SEDIMENT BASIN 1 ACRES 9.47 1000 9470 CULVERT INLET PROTECTION EA 1 500 500 LEVEL SPREADER EA 1 2000 2000 OUTLET PROTECTION EA 1 200 200 EC -2 & 3 DITCH PROTECTION LF 1600 10 16000 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 12 30 360 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 42400.00 CONTINGENCY & ADMINISTRATION LS 25% 10600.00 TOTAL 53000.00 BOND AMOUNT REQUIRED 53000