Loading...
HomeMy WebLinkAboutWPO200800109 Review Comments Road Plan and Comps. 2009-02-10WPO- 2008 -00109 Boulders Road ExtensionFrom: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov] Sent: Tuesday, February 10, 2009 9:57 AM To: Amy Pflaum Subject: WPO- 2008 -00109 Boulders Road Extension WPO- 2008 -00109 Boulders Road Extension Amy, We have reviewed the above plan and have the following comments: - The high side and median edge -of- pavement low points need to be recomputed and located to the stations where they will actually occur when the pavement superelevation is applied. The sag points do not all occur at station 31 +50. The superelevation transitions prevent this from happening. - The high side gutter sag point near approximate station 29 +25 may be close enough (when recomputed) to the existing inlet at station 29 +00, that some minor pavement warping could carry the gutter flow back station 25' to create a new sag condition. Otherwise, a new sag inlet will be required and connected to the system. - Inlet 215, if necessary due to spread exceeding 2', will require an "on grade" longitudinal slope. Relocate inlet 213 down grade and relocate pipe 204 to connect from 213 to 201. This eliminates the long run of pipe under the pavement. - Spread values for high side inlets cannot exceed 2'. Add midpoint spread values for sag inlets 201 & 203. - The gutter width value used in the computations for median inlets should be 1' instead of 2'. This applies to inlets 203, 205, 207 and future 209. Add a note on sheet DP -3 indicating that DI -2B curb inlets are sized based on throat interception only. Grate openings are not accounted for. - Adjust drainage divides on sheet DP -1 as necessary. Please let me know if you have any questions, Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov