Loading...
HomeMy WebLinkAboutSDP200800174 Review Comments Preliminary Site Plan 2008-12-15TO Megan Yaniglos From: Gary Whelan [gwhelan @serviceauthority.org] Sent: Monday, December 15, 2008 2:08 PM To: Megan Yaniglos Subject: Old Trail Village Phase 8 Block 2 ACSA comments TO: Megan Yaniglos FROM: Gary Whelan, Civil Engineer DATE: December 10, 2008 Old Trail Village — Phase 8 — Block 2 - Preliminary SDP200800174 TM 55E -1 -A1 The below checked items apply to this site. Page 1 of 1 RE: Site Plan Technical Review for: X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located on site. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. X 4. An 8 inch sewer line is located on site. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. X 10. Final water plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: Provide a plumbing fixture count to size the water meter. Backflow prevention is required. 12/15/2008