Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800086 Review Comments Bond Estimate 2009-01-09 (3)
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Hollymead Town Center Area - Al 138899.00 PROJECT MANAGEMENT PROJECT NUMBER: WPO200800086 20834.85 SUBTOTAL DATE OF ESTIMATE: 01/06/10 CONTINGENCY LS 10% 15973.39 TOTAL ESTIMATE BY: JPD 175707.24 BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 27.68 $1,500.00 $41,520.00 SILT FENCE LF 3103 $5.00 $15,515.00 SAFETY FENCE LF 3814 $3.00 $11,442.00 TREE PROTECTION LF 400 $5.00 $2,000.00 TEMPORARY FILL DIVERSION LF $3.00 $0.00 DIVERSION DIKE LF 1854 $3.00 $5,562.00 TEMPORARY SLOPE DRAIN LF $20.00 $0.00 SEDIMENT TRAP 1 ACRES 2.4 $1,000.00 $2,400.00 SEDIMENT BASIN 1 ACRES 49.76 $1,000.00 $49,760.00 CULVERT INLET PROTECTION EA 1 $500.00 $500.00 INLET PROTECTION EA 33 $200.00 $6,600.00 OUTLET PROTECTION EA 8 $200.00 $1,600.00 EC -2 & 3 DITCH PROTECTION LF $10.00 $0.00 RIP -RAP LF $55.00 $0.00 CHECK DAMS SQ.YD. $30.00 $0.00 STREAM CROSSING TYPE I EA $1,000.00 $0.00 STREAM CROSSING TYPE II EA $3,000.00 $0.00 STREAM CROSSING TYPE III EA $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 138899.00 PROJECT MANAGEMENT 15% 20834.85 SUBTOTAL 159733.85 CONTINGENCY LS 10% 15973.39 TOTAL 175707.24 BOND AMOUNT REQUIRED 175800.00