Project: The Woodlands Minor Amendment [SDP200700051]
Plan preparer: Scott Collins [scott @collins- engineering.com]
Owner or rep.: The Dovetail Companies
Plan received date: 29 October 2008
(Rev. 1) 6 January 2009
Date of comments: 2 December 2008
(Rev. 1) 11 February 2009
Reviewer: Phil Custer
This minor amendment has been under review for more than a year. The previously submitted plans
included construction and disturbance to the TMP 76 -46B for a temporary haul road. This concept has
been abandoned at the moment and this review is only for the as -built information shown in sheets 1 -7.
Due to the change in scope of the plans and the time since the last submittal, the previous review sequence
has been abandoned. The following comments must be addressed to satisfy engineering review.
1. Please bubble all sidewalk locations and characteristics that are being amended with this plan.
(Rev. 1) Comment has been addressed.
2. Approval from VDOT is required. A plan has been submitted to VDOT for approval.
(Rev. 1) VDOT approval has not yet been received.
3. According to the provided photos, the plan for the east side of the Mountainwood apartment
parking area does not appear to match what is in the field regarding the striping and the curbing
around the flume. If this minor amendment is approved, modifications to the site will need to be
made to match the plan.
(Rev. 1) The waiver for the parking lot design has been granted. The unstriped area may only
be used as large vehicle parking.
4. Please provide computations for the flume opening from the parking lot into the VDOT ditch.
(Rev. I) Comment has been addressed.
5. The dumpster appears to have been sited in an area where a considerable amount of water runs
across the pad. Please provide spot elevations in the area and a computation (intensity of 4.Oin/hr)
to confirm that stormwater does not run through the dumpster area. [18- 4.12.19]
(Rev. 1) The waiver for the drainage across the dumpster pad has not been granted. The
drainage issue must be addressed before the amendment is approved.
The Chief of Current Development has determined that curbing is not required on the north side of the
Mountainwood Apartment parking lot.