Loading...
HomeMy WebLinkAboutSDP200800004 Review Comments Final Site Plan and Comps. 2008-10-03SDP - 2006 -00056 Luxor Commercial Center Philip Custer From: Justin Shimp Ushimp @ddrva.com] Sent: Wednesday, January 07, 2009 9:59 AM To: Philip Custer Subject: FW: SDP - 2006 -00056 Luxor Commercial Center FYI From: Patrick Lawrence [ mai Ito: plawrence @albemarle.org] Sent: Friday, October 03, 2008 10:52 AM To: Justin Shimp Subject: FW: SDP - 2006 -00056 Luxor Commercial Center Justin, VDOT Comments hot off the wire. P From: Denunzio, Joel D., P.E. [ma ilto:J oel. Den unzio @VDOT.virginia.gov] Sent: Friday, October 03, 2008 10:15 AM To: Patrick Lawrence Subject: SDP - 2006 -00056 Luxor Commercial Center SDP - 2006 -00056 Luxor Commercial Center Pat, Page 1 of 3 We have reviewed the latest plan for the subject site plan and all VDOT comments have been addressed. Please let the applicant know that a Land Use Permit will be required for work within the VDOT Right of Way. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 -293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov From: Denunzio, Joel D., P.E. Sent: Friday, February 29, 2008 02:58 PM To: 'plawrence @albemarle.org' Subject: FW: SDP - 2006 -00056 Luxor Commercial Center 1/7/2009 SDP - 2006 -00056 Luxor Commercial Center Page 2 of 3 Pat, I have reviewed the above plan and have the following comments: Sight distance on route 250 is 645 feet. • ROW needs to be shown 1 foot behind the sidewalk on route 250. Also, the at the entrance to the site from route 250 should be offset from being placed directly behind the curb. • The ROW at the roundabout needs to be placed a minimum of 1 foot behind the sidewalk. The sight lines for the roundabout also need to be shown in this quadrant of the intersection and is the proposed ROW does not contain the sight triangle, sight easements will be necessary. • The sidewalk that ties into the existing drugstore entrance needs to have a CG -12. A CG -12 also needs to be added to the western side of this entrance. The sidewalk at this location should also wrap up a connect to the entrance within the existing Eckerd parking lot for continuity. The CG -12 at the entrance off route 250 goes nowhere across the entrance along route 250. Show entrance profiles at entrances for route 250 and Rolkin Road. If you have any questions, please let me know. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 ioel.denunzio@vdot.virginia.gov From: Denunzio, Joel D., P.E. Sent: Wednesday, December 19, 2007 9:35 AM To: 'Patrick Lawrence' Subject: FW: SDP - 2006 -00056 Luxor Commercial Center Pat, I have discussed the sight distance requirement with the design engineer and we have concluded that the sight distance will not be an issue. I do not need to see the sight distance changed on the preliminary plan but it will need to be shown correctly on the final site plan. Thanks, Joel Joel DeNunzio, P.E. 1/7/2009 SDP - 2006 -00056 Luxor Commercial Center Staff Engineer 434 - 293 -0011 Ext. 120 ioel.denunzio @vdot.virginia.gov From: Denunzio, Joel D., P.E. Sent: Thursday, August 23, 2007 11:37 AM To: David E. Pennock Cc: 'Allan Schuck'; Glenn Brooks Subject: SDP - 2006 -00056 Luxor Commercial Center David, We have reviewed the above plan and have the following comments: • Please show proposed ROW lines and indicate if Luxor is public or private. Page 3 of 3 • The ROW line around the roundabout need to show sight lines and possible sight easements. • ROW line cannot be in the middle of a sidewalk. • If the Luxor Road proposed section is public then it needs to be designed in accordance with the Minimum Standards of Entrances to State Highways. • Need road plans, drainage plans, pavement design, entrance profiles, etc. • Sight distance on route 250 needs to be 645 feet in both directions. • Sight distance on Rolkin needs to be in accordance with the design speed. If you have questions or comments, please let me know. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 ioel.denunzio @Vi rain ia DOT. ora 1/7/2009