Loading...
HomeMy WebLinkAboutWPO200700045 Review Comments Stormwater Management Plan 2009-02-06Page 1 of 1 Philip Custer From: Philip Custer Sent: Friday, February 06, 2009 3:59 PM To: 'Scott Collins' Cc: Gerald Gatobu; Amy Pflaum Subject: Engineering Approval of the Stonewater Road, ESC, and SWM plans (WPO- 2007 -00045 and SUB - 2007- 00077) Good afternoon, The Road, Erosion & Sediment Control, and Stormwater Management Plans (WPO200700045 and SUB200700077) submitted 23 December 2008 have been received by Engineering Review and meet Albemarle County minimum checklist items for approval. When the applicant is preparing to request a grading permit, please submit to Current Development Engineering 4 copies of the ESC plan (all sheets excluding SWM), 3 copies of the SWM plan (T -1, S -3, DP -1, SWM -1, and SWM -2), and 2 copies of the Road plan (all sheets excluding ESC and SWM). The E &SC bond amount is $104,000. The SWM bond amount is $75,000. The Road bond amount is $562,650. The forms and instructions to post these bonds can be found on the Community Development Department Web site on www.albemarle.org. You may contact Pam Shifflett (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures. Engineering review has been informed that the preliminary plat has expired. A grading permit will not be issued until this parcel has an approved plat (final or preliminary). Once a subdivision plat has been approved, the E &SC bond and the SWM bond have been posted, and the offsite SWM and access easement plat has been recorded, you may contact the Department of Community Development to arrange a pre- construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. Please let me know if you have any questions. Thanks, Phil 2/6/2009