Loading...
HomeMy WebLinkAboutWPO200800106 Review Comments Bond Estimate 2009-04-15 (3)Development Name Old Trail Phase 2, Block 4 Roads WP0200800106 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item contigency 25% $25,772.37 No. Unit Unit Cost Cost Number Phase "B" installed Claremont Lane 19 +62.88 to 24 +2; road length 460.1 ft 1 aggregate base 6.0 in d 460.1 ft L 30.0 ft W 255.6 cy $43.09 $11,014.76 2 blotted or prime &double seal 0.0 ft L 18.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 3.0 in d 460.1 ft L 30.0 ft W 193.3 tons $88.20 $17,044.69 4 asphalt surface 2.0 in d 460.1 ft L 30.0 ft W 128.8 tons $98.28 $12,661.77 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 920.2 ft $16.59 $15,266.78 8 sidewalk, asphalt 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 5' width 920.2 ft $15.00 $13,803.00 10 ramp CG -12 6 $378.00 $2,268.00 11 street name sign 0 $78.00 $0.00 12 traffic control sign 0 $59.22 $0.00 13 Street Trees 13 $250.00 $3,250.00 14 guardrail (or rebuild wall in right -of -wa 0 ES @ $3700 0.0 ft $20.16 $0.00 15 manhole or drop inlet 0 $1,638.00 $0.00 16 pipe, rcp (15 to 48 ") 0.0 in d 0 ES -1,2 $250 0 EC -1 $200 525.0 ft $27.72 $14,553.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $12,600.00 $0.00 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $4,158.00 24 CBR tests (1 every 0.1 mi. per road) 460.1 ft L 0.92 inc of 500' 2 $189.00 $378.00 25 as -built drawings (1k+ price per 0.1 r 460.1 ft L 0.087 mi. 1 $1,260.00 $2,260.00 26 survey and layout (price per 0.1 mi.) 460.1 ft L 0.087 mi. 1 $630.00 $1,630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (1 lane) 460.1 ft L 0.087 mi. 2 Lanes $2,000.00 $3,485.76 29 VDOT maintenance fee (1 In rd, 1 yr) 460.1 ft L 0.087 mi. 2 Lanes $150.00 $261.43 30 VDOT admin. Cost recovery fee(1 Tarn 460.1 ft L 0.087 mi. 2 Lanes $100.00 $424.29 cost sum $103,089.47 contigency 25% $25,772.37 Total $128,870 4/15/2009