HomeMy WebLinkAboutSDP200800101 Review Comments Final Site Plan and Comps. 2009-03-09SDP - 2008 -101 Oakleigh FinalFrom: Amy Pflaum
Sent: Monday, March 09, 2009 2:52 PM
To: 'Alan Franklin'
Cc: Francis MacCall
Subject: FW: SDP - 2008 -101 Oakleigh Final
Alan, I am forwarding these comments I received from VDOT. -Amy
--------------------------------------------------------------------------------
From: Denunzio, Joel D., P.E. [mailto: Joel .Denunzio @VDOT.virginia.gov]
Sent: Monday, March 09, 2009 2:49 PM
To: Amy Pflaum
Subject: SDP - 2008 -101 Oakleigh Final
SDP - 2008 -101 Oakleigh Final
Amy,
I have reviewed the above site plan and have the following comments:
Item number 2 below has not been addressed. In re- reviewing the site
plan again I have additional concerns with the street trees along Rio Road to
the west of the proposed entrance. Because of the sight distance in relation to
the existing curvature of the road, I am concerned that the proposed trees will
cause a sight distance obstruction and reduce the safety of the entrance. The
trees in this section should be removed from the plan.
The proposed sidewalk along the west section of Rio Road is not drawn
properly at the beginning of the roadway taper. This section scales to 5 feet
and then increases to 7 feet at the entrance.
If you have any questions, please let me know.
Thanks
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio @vdot.virginia.gov
From: Denunzio, Joel D., P.E.
Sent: Friday, November 14, 2008 02:37 PM
To: 'fmaccall @albemarle.org'
Subject: SDP - 2008 -101 Oakleigh Final
SDP - 2008 -101 Oakleigh Final
Francis,
I have reviewed the above plan and have the following comments:
1. Place a "No Left Turn" sign at the first driveway on the left as you
enter the site.
2. Street trees along the street need to meet the clear zone requirements.
The clear zone is 16 feet in this area and measured from the edge of pavement.
The trees proposed a the taper section and west must be placed in accordance
with the clear zone.
3. A permit will be required for any work within the VDOT ROW.
4. A maintenance agreement will be required for all landscaping within the
VDOT ROW.
If you have any questions, please contact me.
Thanks,
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio @vdot.virginia.gov