Project: Lewis & Clark Exploratory Center [SDP200900007 & WP02009000061
Plan preparer: Timothy Miller, PE; Dominion Development Resources
[email: unknown]
Owner /Applicant: City of Charlottesville & County of Albemarle
Plan received date: 27 January 2009
Date of comments: 13 March 2009
Reviewer: John P. Diez — Engineering Technician
A. Final Site Plan
1. Please provide date of topography. [18- 32.6.6, 14 -302, Policy for date]
2. Please specify that all proposed slopes steeper than 3:1 have low maintenance (not grass) ground
cover on the plans.
3. We are unable to locate details or specifications on the dumpster pad.
4. All existing and proposed grades must be labeled at each 50' station point.
5. Culvert pipe sizes on the profiles do not match those of the plans.
6. Please provide Albemarle County general construction notes for streets. Please refer to the Design
Standards
7. Between stations 20 +50 and 21 +00 on the travelway profile, there is a change in grade with no
label or vertical curve.
8. Horizontal stationing and vertical stationing do not appear to align. Please see location of culvert
«A„
B. Stormwater Management Plan
9. SCC channel designations on sheet S4 do not correspond with sheet S9 and the calculations.
10. Water Quality Swale #1 should be designed as two swales, with one portion receiving the flow
from SCC #4 and the other from SCC #5, #6, and #7. Please submit the required Water Quality
Volume versus the volume provided in each swale.
11. The hatching types to designate the channel lining are not being used consistently.
12. Please address MS -19 issues in the outlet for Culvert "C ".
13. Impervious calculations for Water Quality Swale #2 do not include the drainage area for SCC #1.
Water Quality Volume appears inadequate.
14. Please provide Albemarle County general stormwater notes.
15. A completed copy of the Standard Stormwater Management Maintenance Agreement and fee for
recordation for the stormwater facilities required prior to final approval. [ 17 -304E] The forms and
instructions can be found on the Community Development Department website on
www.albemarle.org.
Albemarle County Community Development
Engineering Review Comments
Page 2 of 2
C. Erosion and Sediment Control Plan
16. Please provide the correct detail for drop inlet protection
17. Construction entrance must drain to a sediment trap or sediment basin.
18. Please provide temporary and permanent seeding symbols (TS, PS)
Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations,
and narratives to Current Development Engineering.
Current Development Engineering is available from 2:30pm — 4:OOpm on Thursdays to discuss these
review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an
appointment.
E1_fsp_JPD_Lewis & Clark Exploratory Center