Alex Foraste, P.E.
c/o McKee Carson and Field Sport Concepts, Ltd.
301 East High Street
Charlottesville, VA 22902
Phone: 434.979.7522 Fax: 434.977.1194
E -mail:
aforaste@mckeecarson.com
Wendy Fisher / Ellie Grinspun
c/o Montessori Community School of Charlottesville
1538 Richmond Road
Charlottesville, VA 22960
E -mail:
wfisher@motessoripantops.org
egrinspun@montessoripantops.org
Re: SDP2008 -098 Montessori Community School Final Site Plan and Special Use Permit
SP200900001
Dear Sir and Ladies,
The Special Use Permit, SP200900001, was approved by the Albemarle County Board of
Supervisors, Wednesday, March 11, 2009. Because of that action you will be required to reference
it on the front page (Sheet 01) of your final site plan. You will need to show both the Use Permit
number and the conditions approved by the Board on the first sheet of the final site plan, as were
previously shown under Use Permit and Conditions and in the column under Project Data.
As we are working toward the final approval of this site plan, it is my intent to bring to your
attention other amendments you will need to make prior to submitting you final review copies prior
to approval. Please address the following issues:
1. The Tree Conservation Checklist on Sheet 06 needs to be signed and dated.
2. Engineering has no objections and has informed you of the bonds required for erosion and
sediment control and storm water maintenance.
3. You will need to observe the comments of the Architectural Review Board to provide the
Albemarle County Community Development
Engineering Review Comments
Sheet 2 of 2
grading area of the proposed greenhouse tree protection and landscaping.
4. Albemarle County Service Authority (ACSA) requested the addition of a back flow valve
and labeling of a private sewer line. Please ensure that this has been accomplished prior to
signature copies.
Please review the comments and revise the plan of the proposed development accordingly. Your revisions should be
resubmitted directly to the reviewer who commented along with the attached revised application submittal form.
If you have any questions about the comments of a specific agency please contact that agency directly. If you
have any questions about the review process please feel free to contact me.
Sincerely,
Patrick Lawrence, Planner
Zoning & Current Development
File: SDP - 2008 -098